1 / 3

Flush out schedules for preparation and execution OL455 levels to MEF

Flush out schedules for preparation and execution OL455 levels to MEF B aseline instrument configuration (depends on software status?) both specs 390 to 950, DBS at 605nm, simultaneous both specs 390 to 950, DBS at 605nm, sequential blue spec only, option 370 to 720

Télécharger la présentation

Flush out schedules for preparation and execution OL455 levels to MEF

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Flush out schedules for preparation and execution • OL455 levels to MEF • Baseline instrument configuration (depends on software status?) • both specs 390 to 950, DBS at 605nm, simultaneous • both specs 390 to 950, DBS at 605nm, sequential • blue spec only, option 370 to 720 • two sequential scans, would saturate blue half of CCD • decrease # of channels by 2, couple Red DBS output to BSG • foreoptic to track assignments • LED protocol • Iris adjustments to get all tracks on scale • tests at Snug on Ho’okele • when can we start taking data? • describe and implement characterization & calibration steps • BluLoop and Cool White stability • Specs themselves: responsivity, stability, track/imaging stability, FOV, integration time, linearity, along track, understand saturation, on-chip binning, camera sync error • coordinate team efforts

  2. August Schedule

  3. September Schedule

More Related