An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Document SystemsValidation BIT 230 Chapters 3 and 4 (Huxsoll)

  2. cGMP • Biotech companies coming to GMP like large pharma difficult transition • Problems due to: • tight budgets • limited (trained) personnel • R & D scientists only

  3. Documentation for cGMP • Provides project planning • Record of what and how was done- plus any changes implemented • IT IS REQUIRED THE cGMP

  4. Biotech and Documentation • Overlooked in early stages • Viewed as cumbersome and time consuming • From this, delays in early development occur • Need top down commitment to documentation

  5. Types of Documentation • Early on, scope and project goals • timeline or Gantt chart • http://www.netmba.com/operations/project/gantt • http://searchcio.techtarget.com/sDefinition/0,,sid19_gci331397,00.html

  6. Gantt chart • Planning tool • timelines showing duration stages of the project in chronological order • interrelationship between various stages of the project • responsible parties for each phase of the project • Figure 3.1, Page 29

  7. Areas of Documentation • Process overview • explain major process steps • detail sufficient so personnel at each step knows how the product is made and what their role is • blueprint of project • process targets

  8. Areas of Documentation cont’d • Parts of the process overview: • 1. Purpose, including cell type and purification steps • 2. Required resources - raw materials, facilities, equipment, personnel requirements, test methods • 3. Process outline- step-by-step outline • 4. Product characterization- tests to assure quality • 5. Change authority - how and who

  9. Areas of Documentation cont’d • Research notebooks • what you have kept in my courses • great support for process validation • detailed experimental results • anyone picking up notebook can repeat your steps • lots of info about the preclinical material and its properties

  10. Areas of Documentation cont’d • 5 parts to a research notebook: • 1. Introduction • 2. Experimental plan (include alternate plans) • 3. Observations and data (raw data) • 4. Discussion and results • 5. Conclusion

  11. Areas of Documentation cont’d • SOPs • preclinically after stabilization of process • REPRODUCIBILITY (again, anyone who knows the techniques can produce the product) • however, not too rigidly written • differ from lab notebooks - HOW?

  12. Areas of Documentation cont’d • SOPs cont’d - Value • while being written, forced to think of problems- may avert costly errors this way • standardize technician training • minimize misunderstandings about the process • if changes are made to the process, SOP history will be available by end user for review • tells the user what to record

  13. Areas of Documentation cont’d • Testing Documents • SOPs standardize test methods - include equipment, methods and reagents • minimize variation from operator to operator (“pilot error”) • include use of positive and negative controls • outline data and test values that need recording

  14. Areas of Documentation cont’d • Batch Production Records (BPRs) • provide lot information- critical in production (recalls often by lot number) • develop lot-specific forms for each appropriate step in the SOP • Pages 33-34- CFR-required batch record sections • go over batch records given in class

  15. GLP documentation • Preclinical operations • user-friendly document numbering system (needs to accommodate many doc types) • index should contain 3 parts: • functional group (testing vs. processing) • stage of process (scale-up, purification) • type (general item, specific procedure, etc.)

  16. GLP docs cont’d • Each doc reviewed by a person in each functional unit (process dev., QA, production) • use document review record (Page 35) • format of document standardized • BPRs- data and text together or separate- find consensus (see page 36 Figure 3.3)

  17. GLP docs cont’d • Raw material documents • catalogue materials used • list all required raw materials • assign identity numbers to each reagent • inspection of raw materials; visually, chemically and microbiologically- WHAT are you looking for? • USP or ACS

  18. GLP docs cont’d • Sampling documents • create early in process also • purity, integrity, yields • types of tests: • endotoxin • microbiological • ELISA • PAGE • HPLC

  19. GLP docs cont’d • Laboratory documents • raw material and in-process testing • detailed info, such as time when and amount of sample to be taken, lot number, date, etc. • how precise and accurate from original test data (accepted standard deviation) • location of original test data

  20. GLP docs cont’d • Laboratory documents cont’d • necessary calculations to arrive at data • logbooks for instruments and reagents • calibration records • lab personnel training docs • Page 39 Figure 3.4- document of a simple lab procedure

  21. GMP documentation • Extension of docs begun in preclinical lab • includes prompts were information needs to be entered • need QA tested raw materials (remember, the product is now going into a person!) • record expiration date- cannot use 1 day past that date (not so in a research lab)

  22. GMP documents • Contain process limits (maintains control of process) • limits include process parameters • pH • temperature • volume • concentration • WHAT are some other limits?

  23. GMP documents • Steps after a process is complete: • technician verifies and signs that process is complete • supervisor reviews and signs documents • independent reviewer QA’s the documents (and the process) • Therefore, each document is reviewed 3 times • have review document for this process (GETTING the picture about how much writing goes on!) • FILE docs when done for safe keeping

  24. Misc. GMP Documents • Records for preventative maintenance, calibration and usage of equipment used in production • Make sure equipment functions same from run to run

  25. Validation Chapter 4

  26. Validation • Document that a manufacturing process is under control • Capable of consistent production of a biopharmaceutical • Begins with product specifications

  27. Validation • Can’t test for quality, so validate • Therefore, each step of manufacturing process validated so you have assurance of quality product

  28. Important Validation Definitions • Calibration • measuring device produces results within predetermined limits (compared to a reference standard) • Cell Seed • aliquot of cells derived from single tissue • Certification • review and approval process (final step)

  29. Important Definitions, cont’d • Concurrent Validation • written evidence that process is working (by gathering data during the process) • Drug Product • a finished dosage that contains active ingredient (s) • HVAC • Heating, ventilation, and air conditioning

  30. Important Definitions, cont’d • Intermediate • substance produced in one stage of production and used at another (produced by chemical, biological or physical action) • Installation Qualification (IQ) • written proof of installation according to specs • Master Working Cell Bank (MWCB) • derived from one or more ampoules of the cell seed- shown to be uniform composition (WCB)

  31. Important Definitions, cont’d • Operational Qualification (OQ) • written proof that system performs as designed • Performance Qualification (PQ) • approved plan to validate a system or process • Population Doubling Time (PDL) • number of doublings that culture has undergone- Why is this important?

  32. Important Definitions, cont’d • Process Validation • documented evidence that a process will consistently produce a product • Prospective Validation • written evidence, prior to carrying out a process, that the process will do as suggested • Qualification • separate validation- shows system is suitable to carry out designated process

  33. Regulatory requirements • FDA - safety and efficacy of drug supply • See quote page 48 under section 4.1.3 • Parts 210 and 211 of GMPs - if FDA thinks drug is tampered they may take action against the producer • highly trained FDA personnel to carry out inspections of drug makers

  34. Process Development • IF process development weak or absent, inconsistent results will appear during manufacturing runs • Involves personnel from validation, QA, QC, manufacturing and engineering • Section under change control (page 49)

  35. Parameters of Process Validation • Validation of utilities • proper installation • manufacturer’s specs • moisture and airborne product contamination • purity • take samples from both inlet and outlet of unit (when testing water, steam, etc.)

  36. Parameters of Validation, cont’d • Environmental control • design of facility and environmental controls keep operation within specified limits • conditions differ based process performed in that area (cold, moist, etc.)- e.g. protein purification in a 4ºC room • microbiological testing of surfaces, air, etc (do you need clean room facilities?) • facility sanitization

  37. Parameters of Validation, cont’d • Cleaning methods and changeover • not only clean surfaces, but document residual detergent levels on washed equipment & surfaces • endotoxin testing (what are endotoxins?) - can use LAL test • perform assays on final rinse water- determine levels of residual products • what should be the acceptable level of residual material?

  38. Parameters of Validation, cont’d • Bioinactivation • of bacterial or cell culture waste • different level of requirements based on Biosafety level • some procedures include: • inactivation of organisms prior to removal from a closed system • inactivate wastes before disposal in normal trash

  39. Parameters of Validation, cont’d • Sterilization • validate process so sterility assurance level is achieved • Methods include: • filtration • autoclaving • steam-in-place (SIP - some bioreactors) • vessel heated with a solution

  40. Parameters of Validation, cont’d • Sterilization, cont’d • Autoclaves - use empty chamber heat distribution studies (to determine temperature uniformity) • Biological indicators (BIs) to determine when organism is eradicated (called D-value or BI death rate) • vendor specific D-value so keep that in mind

  41. Parameters of Validation, cont’d • Media hold challenge • length of time a vessel hold a liquid and remain sterile • push the procedure to see when it fails • how does manipulations (adding or removing items) affect the sterility • important if you need to make media in advance and hold a while (how about the LB we use in class?)

  42. Parameters of Validation, cont’d • Depyrogenation • sterilization of heat stable materials • use an endotoxin challenge (since endotoxins are heat stable) • empty chamber and loaded chamber heat studies performed

  43. Parameters of Validation, cont’d • Filtration • need to evaluate product, steps and filter media • early process uses: sterilization of media, removal of cellular debris and removal of intermediate • late stage process uses: microbial retention (with altering final product • evaluate filters themselves

  44. Parameters of Validation, cont’d • Programmable logic controllers (PLCs) • computers that automate the processes - must be validated also • hardware • software • operating system • What are some problems here?

  45. Bulk drug manufacturing • Making large batch of drug at once • MWCB important - do the cells and DNA remain intact during production • perform validation tests for acceptability of starting material

  46. MWCB • History and morphology of cell line, plasmid, and transfection into host cell • storage, maintenance and propagation of cell line • cell markers • tumorigenicity studies • expression of endogenous retroviruses • test for presence of virus, fungi, bacteria or mycoplasma

  47. MWCB cont’d • Bacterial production systems check for: • carbohydrate use • antibiotic resistance • contamination • sequence and restriction map of plasmid • growth rate of host • SDS-PAGE of product profile

  48. Recovery and purification • Remove impurities from the drug substance • eliminate inadvertent contamination (Flu vaccine) • therefore, validate recovery process!

  49. Pharmaceutical Manufacturing Validation • Similar to biotech manufacturing, but has special issues such as aseptic processing, lyophilization and packaging • Aseptic processing • aspects of filling of a drug product so that contamination is not introduced • fill with cell growth media as a control

  50. Pharmaceutical Manufacturing Validation, cont’d • Lyophilization • freeze drying- extends shelf life and reduces moisture content • freeze-dry placebo as control; test several cycle to assure process uniformity • filling operation important to duplicate volumes in every vial