Joint Working Group 2009
The Joint Working Group (JWG) 2009 meeting covered key updates on the Memorandum of Understanding (MOU) and Technical Agreement (TA), including the current status of the VIKING initiative. Preparations for the Joint Program Conference (JPC) were discussed, alongside the establishment of a Collaborative Community of Interest through the JKO Portal. Updates on future I/ITSEC and ITEC demonstrations were shared. The JWG recommends a JPC meeting in Stockholm on May 25, aligning with VIKING events. Future meetings will include monthly video teleconferences when possible.
Joint Working Group 2009
E N D
Presentation Transcript
Joint Working Group 2009 • Meeting in Suffolk APR • VTC 16 MAY • VTC 16 JUNE • Meeting in Suffolk JULY
Joint Working Group 2009Scope: • Updates on MOU and TA • Updates on status VIKING • Preparations JPC • Collaborative Community of Interest - JKO Portal • Updates on I/ITSEC and ITEC demonstrations
JWG future meetings • Meetings in conjunction with VIKING events(NLT VIKING 11 IPC) • Video Tele Conferences once a month (if possible in conjunction with VIKING VTC) • TA working groups to be formed and meet • JWG recommends JPC meeting in Stockholm 25 MAY(in conjunction with VIKING 11 MPC)