beth
Uploaded by
8 SLIDES
206 VUES
80LIKES

Bluetooth Object Tracking System Design for Enhanced Safety

DESCRIPTION

This report details the progress of our electronic system designed to track the distance of objects using Bluetooth technology. The system aims to prevent the loss of property, pets, and children, addressing the alarming statistic of 2,185 missing children reported daily by the DOJ and the high percentage of pet ownership in U.S. households. Major milestones achieved include part ordering, website design, and microcontroller programming. Ongoing tasks involve coding threshold levels and prototype design, with testing and debugging planned for completion soon.

1 / 8

Télécharger la présentation

Bluetooth Object Tracking System Design for Enhanced Safety

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status Report #6 Simoo Sipili Ionatana Sipili Anthony Mickens LizardoBuleje 3/19/2012 Design an electronic system to track the distance of an object using Bluetooth. TrackReady

  2. Need for Design • To prevent the loss of property, pet, and/or children • Statistical Facts- • DOJ reported an average of 2,185 children missing every day • ASPCA states that 65% of households in the U.S. have pets • Common knowledge: Everyone will or had misplaced a personal item in their lifetime Milestones: • Order all parts 2/6/2012-complete • Design website 2/16/2012-complete • Program microcontroller 3/1/2012~75% complete • Construct prototype 3/15/2012 • Debug prototype 4/1/2012

  3. Task Recently Completed • We have uploaded the team website. • Established communication between android and arduino board. • Have written the program source code to calculate signal strength.

  4. Ongoing Tasks • Working on coding the threshold levels. • Designing the prototype. • Finish the project file.

  5. Upcoming Tasks • Testing and debugging the prototype. • Start to work on the demo day poster.

  6. Functional Block Diagram

  7. Project Schedule

  8. Questions