1 / 10

Utility Installation Review (UIR) System

Utility Installation Review (UIR) System. Internet-Based Utility Permit Implementation. Why is It Important?. Large number of utilities within the ROW Thousands of utility permits per year Hundreds of utility agreements per year Institutional memory at TxDOT

betty_james
Télécharger la présentation

Utility Installation Review (UIR) System

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Utility Installation Review (UIR) System Internet-Based Utility Permit Implementation Transportation Operations Group

  2. Why is It Important? • Large number of utilities within the ROW • Thousands of utility permits per year • Hundreds of utility agreements per year • Institutional memory at TxDOT • Quality of information provided by utilities • TTI Research Project 0-2110 • Prototype GIS-based utility inventory model • Prototype Internet-based utility permitting system Transportation Operations Group

  3. Workflow Diagram - Overview • Notice of Proposed Installation Submitting Reviewing • 48-hr Notification • Traffic Control Plan Approval/Pre-construction • Approval Construction Post-construction • As-Built Certification Transportation Operations Group

  4. Workflow Diagram (Part 1) Submitting Reviewing Approval Transportation Operations Group

  5. Workflow Diagram (Part 2) Pre-construction Construction Post-construction Transportation Operations Group

  6. User System Requirements • Desktop/Laptop with Pentium Processor or higher • Internet Explorer 6.0 • Adobe Acrobat Reader 6.0 • Internet connection • Email account • UIR active account Transportation Operations Group

  7. Major System Functionality • Database-driven • Interactive GIS-based permit location • Permit event and document tracking • PDF file conversion • Utility company/DOT user management • Tabular and map-based reports • Performance measures Transportation Operations Group

  8. Benefits • Automation • More thorough, faster reviews • Reporting and accountability • Institutional memory • Document retention practices Transportation Operations Group

  9. Challenges • Garbage in / garbage out … • Automation does not “automatically” result in better, more reliable deliverables • DOT and utility company training • Utility company compliance • Utility Accommodation Rules • Notification to DOT prior to construction Transportation Operations Group

  10. Additional Information https://apps.dot.state.tx.us/uirpro/ http://uir.tamu.edu/uirdemo/ (demo) • Online help system • User manual • Training materials Cesar Quiroga – TTI (RS): c-quiroga@tamu.edu, 210-731-9938 Jesse Cooper – ROW (PD): jcoope2@dot.state.tx.us, 512-416-2874 John Campbell – ROW (PC): jcampbel@dot.state.tx.us, 512-416-2909 Transportation Operations Group

More Related