1 / 2

Instructions for Students and Proctors for EMIS 7303 Mid-Term Examination

Instructions for Students and Proctors for EMIS 7303 Mid-Term Examination. A 90 minute time limit is imposed. This examination is open book and open notes. Students are expected to bring prepared material for the first nine exam items. Hand calculators are allowed, laptops are not allowed.

Télécharger la présentation

Instructions for Students and Proctors for EMIS 7303 Mid-Term Examination

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Instructions for Students and Proctors for EMIS 7303 Mid-Term Examination • A 90 minute time limit is imposed. • This examination is open book and open notes. • Students are expected to bring prepared material for the first nine exam items. • Hand calculators are allowed, laptops are not allowed. • The student may not confer with another student or observe another student’s responses during the examination. • The student name must be on each unbound page – both project and in-class examination pages. • Exams from video students must be postmarked on or before March 20.

  2. EMIS 7303 Mid-Term Examination Provide items 1 - 9 listed below in briefing chart format. 1. Project introduction/background/orientation chart. (4 pts) 2. Identification of key requirements. (6 pts) 3. Program performance measures (technical, cost, and schedule) with thresholds and objectives. (5 pts) 4. Project work breakdown structure (WBS). (6 pts) 5. Integrated master plan for the WBS element(s) of interest. (6 pts) 6. Integrated master schedule in network form with personnel needs identified. (6 pts) 7. Project risk assessment. (6 pts) 8. Risk abatement plan for highest risk item/driver. (6 pts) 9. Development progress metrics. (5 pts)

More Related