1 / 17

IONS FOR LHC (I-LHC)

IONS FOR LHC (I-LHC). Linac3, injection & ejection lines, LEIR, PS. TIMING for Power converters. Jean-Pierre Royer AB/PO. Power converters summary in regard of the timing. All characteristics of the power converters are in the PO data-base :

blair-cain
Télécharger la présentation

IONS FOR LHC (I-LHC)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IONS FOR LHC (I-LHC) Linac3, injection & ejection lines, LEIR, PS TIMING for Power converters Jean-Pierre Royer AB/PO Timing I-LHC/LEIR Presented by J.P. Royer

  2. Power converters summaryin regard of the timing All characteristics of the power converters are in the PO data-base : ProgramsFile maker proOpen an existing file hosts PSPC7840Accueil ions LHC Type of power converters, Name of responsible, Current max, type of control, electronics crate etc… etc…etc Timing I-LHC/LEIR Presented by J.P. Royer

  3. Power converters summaryin regard of the timing • Each Timing pulse transit by a cable. • Timing for a power converter  pulse ~30Volts, ~1 microsecond • This pulse impose an event in the power converter • To speak about timing  to speak about control Timing I-LHC/LEIR Presented by J.P. Royer

  4. Timing and control summary(1) Timing I-LHC/LEIR Presented by J.P. Royer

  5. Timing and control summary(2) Timing I-LHC/LEIR Presented by J.P. Royer

  6. Power converters network summary Mil 1553: idem network PS RS 422: Commercial power converters PLC S7/300: system electron cooling Control RF: system RF (PLC) Timing I-LHC/LEIR Presented by J.P. Royer

  7. Power converters GFA and OASIS summary GFA : A : Analogue (DAC output provided by CO at its rack) O+A: Optical interface 2*A: Two analogue signals for VGUN electron cooling S: Serial digital OASIS: Yes or No: No oasis for DC power converters SCO-A: analogue output from converter (sampler provided by CO at its rack) O+SCO-A: Isolated (Optical) sampler HT area electron cooling Timing I-LHC/LEIR Presented by J.P. Royer

  8. Timing acquisition summary Type of timing in data –base PO: A one pulse for Acquisition with control 1553 B one pulse for Acquisition with control RS 422 D Timing for discharge capacitors EIX.ACQN-POW : E (LEAR), I (injection), X (timing), ACQN (acquisition), POW(power) EEX.ACQN-POW : E (LEAR), E (ejection), X (timing), ACQN (acquisition), POW (power) Clock : 10 MHZ Position in the cycle: Beam Timing I-LHC/LEIR Presented by J.P. Royer

  9. Pulsed Dipoles 5 Hz Power Supplies • characteristics : - output current : +/- 20 A - flat top stability < - flat-top duration : 1 ms - 5 Hz repetition rate - charging voltage : 600 V - modification of the power supplies used for the Booster injection dipoles • simplified schematic 14 Units Timing I-LHC/LEIR Presented by J.P. Royer

  10. Example with the Pulsed dipoles 5 Hz power supplies • FW charge of the capacitors • W stop the charge of the capacitors, disconnect the regulation loop to prepare the discharge. • ST discharge of the capacitors • AQN measure of the current magnet, passage of the beam. • All the pulses timing are referred on the beam ( ex: W -12 msec before the beam) • The principle is the same for all the discharge power converters. Timing I-LHC/LEIR Presented by J.P. Royer

  11. Timing for current dipoles 5Hz (1) FW W ST AQN Timing I-LHC/LEIR Presented by J.P. Royer

  12. Timing for current dipoles 5Hz (2) ST AQN Ch4: Timing Start Ch1: Im 4A/div Timing I-LHC/LEIR Presented by J.P. Royer

  13. Current dipoles 5Hz Timing I-LHC/LEIR Presented by J.P. Royer

  14. Timing Dipoles and Quads 5 Hz • Same FW and W for all Dipoles and Quads 5HZ • 2 START for Dipoles and Quadripoles ( difference of load) BEAM Timing I-LHC/LEIR Presented by J.P. Royer

  15. Timing discharge capacitors power converters summary EIX.FW DIP-QUAD : E (LEAR), I (injection ), X (timing), FW (forewarning), DIP-QUAD (Dipoles-quads) EIX.W DIP-QUAD : E (LEAR), E (ejection), X (timing), W (warning), DIP-QUAD (power) Clock : 1 KHZ Position in the cycle: see the table EIX. ST1-DIP and EIX.ST2-DIP Start dipôles EIX.ST1-QUAD and EIX.ST2-QUAD Start quadripôles Clock : 1 MHZ Position in the cycle: see the table Timing I-LHC/LEIR Presented by J.P. Royer

  16. Timing ejection septum and injection PS prevision ST-SMH40 ST-SMH26 ST-BSW26 3 different START Timing I-LHC/LEIR Presented by J.P. Royer

  17. Conclusion • - For the power converters all the timing requirements are defined (except TT2) • - Some adjustments will be necessary (ex: start discharge capacitors) • - Timing for TT2 must be defined with mode protons or ions and degaussing • Good collaboration with CO (ex: test dipoles 5Hz with external timing) • Cables network (1553,422), timing, oasis, GFA will be installed by CO, in progress. Timing I-LHC/LEIR Presented by J.P. Royer

More Related