“LNG Security Vulnerability Assessment”

“LNG Security Vulnerability Assessment”. National Issues. Public concerns terrorism is a major factor in LNG import terminal siting LNG industry does not have a standard security vulnerability assessment methodology to help analyze and explain these risks consistently. National Issues.

bob
Télécharger la présentation

“LNG Security Vulnerability Assessment”

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. “LNG Security Vulnerability Assessment”

  2. National Issues • Public concerns terrorism is a major factor in LNG import terminal siting • LNG industry does not have a standard security vulnerability assessment methodology to help analyze and explain these risks consistently.

  3. National Issues • Security could be more uniformly assessed and risks more clearly understood and compared. • This paper examines the issues of making security risk decisions in the LNG industry and the requirements and industry methods available.

  4. Overall Issue • US does not have a common SVA framework for decision-making by Government and private sector • Lack of common risk terminology • Lack of guidance on threat assumption • Lack of guidance on consequence assumptions/analysis • Lack of consensus on risk assessment/acceptable risk criteria • Note – DHS RAMCAP project and DOE/FERC guidance addressing these issues • In the mean time, companies are encouraged to develop their own guidelines

  5. LNG SVA Requirements

  6. RAMCAP Concept Development • Purpose: • Develop a common risk-based method for comparing security risk across sectors of US infrastructures and key resources • Determine national, regional vulnerabilities • Determine need for national security upgrades and specific infrastructure upgrades • Allocate Federal and private sector resources based on risk • Limitation: • Not a complete assessment – most critical only

  7. Step 1: Assets Characterization Step 2: Threat Assessment Step 3: Vulnerability Analysis Step 4: Risk Assessment Step 5: Countermeasures Analysis API SVA Methodology

  8. Example WSA Risk Matrix

  9. 33 CFR Part 105 Requirements • The FSA report requirements under § 105.305 (d), include: • On-Scene Survey; • Existing Security Measures; • Vulnerabilities; • Security Measures to Address Vulnerabilities; • Key Facility Operations; and • List of Identified Weaknesses.

  10. 33 CFR Part 105 -Security Threats • Damage to or destruction of the facility or of a vessel moored at the facility • Hijacking or seizure of a vessel moored at the facility or of persons on board • Tampering with cargo, essential equipment or systems, or stores of a vessel • Unauthorized access or use • Smuggling dangerous substances and devices • Use of a vessel moored at the facility to carry those intending to cause a security incident • Use of a vessel moored at the facility as a weapon or as a means to cause damage or destruction • Blockage of entrances, locks, and approaches • CBNRE attack;

  11. Waterway Suitability Assessment (NVIC 05-05) Scope of WSA: • Address transportation of LNG from LNG tanker’s entrance into U.S. territorial waters, through its transit to/from LNG terminal (receiving) facility, and include operations at vessel/facility interface. • Address navigational safety issues and port security issues. • Identify relevant safety and security issues from broad viewpoint of impact to entire port, • Provide a detailed review of specific points of concern along LNG tanker’s proposed transit route.

  12. WSA (cont.) References for WSA: • USCG’s “Risk-Based Decision-Making,” COMDTINST M16010.3 (series). • USCG’s “Risk-Based Decision-Making Guidelines,” 3rd Edition (http://www.uscg.mil/hg/g-m/risk/e-guidelines/RBDMGuide.htm) • Local Area Maritime Security Plan (AMSP). • Sandia National Laboratories Report SAND2004-6258, “Guidance on Risk Analysis and Safety Implications of a Large Liquefied Natural Gas (LNG) Spill Over Water,” December 2004.

  13. Contents of NVIC 05-05 (cont.) Encl. 3: Risk Management Quick-Reference Tool • Contains Sensitive Security Information (SSI), not subject to public disclosure. • Describes suggested attack scenarios and corresponding risk management strategies that are • recommended or • suggested

  14. WSA (cont.) Outline of WSA: • Port Characterization • Characterization of LNG Facility and LNG Tanker Route • Risk Assessments (Safety and Security) • Risk Management Strategies • Resource Needs for Safety, Security and Response • Conclusions and Recommendations

  15. WSA (cont.) 1. Port Characterization: • Area Maritime Security Plan (AMSP) as basis. • Summary of port environment. • Evaluation of impact of proposed LNG operations on entire port community to assess resources needed to provide a safe and secure environment.

  16. WSA (cont.) • Characterization of LNG Facility and LNG Tanker Route: (cont.) • Contents: (cont.) • Proposed LNG tanker characteristics and the frequency of deliveries. • Application of the “Zones of Concern” applied to entire length of transit. • Population density for areas impacted. • Critical infrastructure & key assets list (e.g. from AMSP).

  17. WSA (cont.) • Characterization of LNG Facility and LNG Tanker Route: (cont.) • Contents: (cont.) • Density and character of marine traffic along each segment of waterway • Shore-side community demographics and important structures • Maneuvers required to berth LNG vessels and their potential impacts to other traffic in waterway.

  18. WSA (cont.) • Risk Assessment (Safety & Security): • Key assumptions identified and documented • Appropriate risk assessment methodology • Identification of events/conditions that could trigger a release of LNG: • Unintentional or accidental events (e.g. collisions, groundings, spills) for safety risk assessment • Intentional events (e.g. terrorist act, sabotage) for security risk assessment

  19. WSA - Route • Characterization of LNG Facility and LNG Tanker Route: • Area Maritime Security Plan (AMSP) as basis. • Focus on entire length of tanker’s route, divided into logical segments. • Consultation with harbor pilots. • Contents: • Information listed in 33 CFR 127.007 & 127.009. • Details of the proposed LNG facility waterfront configuration and physical construction.

  20. WSA -Segments Section 2: High Vessel Traffic Section 3: High Population Density Section 4: Positioning to Terminal Section 1: Traffic Separation Scheme Section 5: Offloading at Terminal Inbound Outbound

  21. Maritime Safety Hazards

  22. Two concentric isotherms 37.5 k W/m2 and 5 kW/m2 Zone 1 - 500 m Zone 2 - 1600 m Illustration of Zones of Concern (Intentional Release)(NVIC 05-05, Enclosure 11)(Not to Scale)

  23. Illustration of Zones of Concern (Intentional Release)(NVIC 05-05, Enclosure 11)(Not to Scale) Zone 3 - 3500 m

  24. 3500 m 1600 m 500m Illustration of Zones of Concern (Intentional Release)(NVIC 05-05, Enclosure 11)(Not to Scale)

  25. WSA (cont.) • Risk Assessment: (cont.) • Analysis of individual safety and security risks of proposed LNG operations, in terms of: • Probabilities • Consequences • Vulnerabilities • Threats • Sensitivity analysis

  26. WSA (cont.) • Risk Assessment: (cont.) Security Risk Assessment: (cont.) • Vulnerability Assessment: • Addresses the likelihood that an attack will succeed. • Identify exposures that might be exploited to ensure the success of an attempted terrorist attack or related threat. • Assess vulnerabilities to vessel, facility and port community: • System vulnerabilities • Asset vulnerabilities

  27. WSA (cont.) • Risk Assessment: (cont.) Security Risk Assessment: (cont.) • Threat Assessment: • Addresses the likelihood of an attack. • Evaluate ways in which particular people and property (i.e. targets) may be attacked. • Identify specific attack scenarios based on Sandia Report throughout the waterway. • Identify areas in the port (and throughout the waterway from which an attack could be launched.

  28. WSA (cont.) • Risk Management Strategies: • Identification of all possible, and evaluation of all appropriate, risk management strategies (measures) for identified areas of risk (using the matrix form the Risk Management Quick-Reference Tool available from the COTP/FMSC as a minimum. • Identification of ways to prevent an identified accident or attack from occurring • Development of measures to mitigate the consequences should a release of LNG occur.

  29. WSA (cont.) • Risk Management Strategies: (cont.) • Addresses risk management measures for: • Safety • Security • Response • Consideration of scalable risk management measures to address LNG operations at elevated Maritime Security (MARSEC) levels for both: • Specific threats or causal events • Non-specific threats or causal events

  30. WSA (cont.) • Resource Needs for Safety, Security and Response: • Identification and tabulation of options for resources needed to implement all proposed risk management strategies • Identification of resources currently available • Use of “gap analysis” to evaluate new resources and how these might be obtained.

  31. WSA (cont.) • Conclusions and Recommendations: • Summary of port safety and security risk implications of introducing LNG operations in the port. • Summary of resource gap analysis to identify key resources needs, new resources required

  32. WSA (cont.) • WSA is a useful framework for analyzing navigational, safety, and security issues • It includes involvement of key stakeholders and addresses substantial issues in a risk-based framework • It proved effective in identifying vulnerabilities and in defining resource allocation

  33. WSA (cont.) • WSA benefits from a more specific process to make risk-based decisions • The applicant needs to define this process in cooperation with stakeholders sufficient to make necessary risk and resource allocation decisions

  34. LNG SVA Needs • The areas needing structure/definition in LNG SVAs include: • More defined risk-based assessment process • Threat definition • Consequence assumptions and definition • Population exposure assumptions • Vulnerability definition • Emergency response and evacuation assumptions • Mitigation and effectiveness assumptions • It is recommended to adopt a standard methodology for all needs for uniformity