An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CHALLENGES AND LESSONS LEARNEDDURING THE TWO PHASED DEVELOPMENT OFTHE LOW INDIAN OCEAN NETWORK SUBMARINE CABLEFrancis Charpentier, Cynthia Perret, Patrick Daniel, Jean-Claude Marc (France Telecom Orange)Caroonanaden Seeneevassen, Pranilsingh Gobin (Mauritius Telecom)Jean-François Glenet (Société Réunionnaise du Radiotéléphone)Paul Lefébure, Vikram Ramgolam (EMTEL Ltd.)Arson Benja (Orange Madagascar)Andrew Kemosi, Vitalis Mwakidedi (Telkom Kenya) Paris, 24 April 2013 2013 SubOptic Conference

  2. The LION / LION2 regional cable system LION LION2 System - Poster Presentation - 24 April 2013

  3. THE LION/LION2 SUBMARINE CABLE SYSTEM CABLES INTERCONNECTED • SAT3 / SAFE • UAE/KENYA (« TEAMS ») • EASSy • SEACOM COUNTRIES INTERCONNECTED • Kenya (LION2) • Mayotte (LION2) • Mauritius (LION) • Madagascar (LION) • La Réunion (LION) TECHNICAL CHARACTERISTICS • 2 fiber pairs • Initial wavelengths 10Gb/s OOK • Initial equipped capacity 2 x 10Gb/s per FP • Initial design capacity 640 Gb/s per FP • Upgradeable with 40Gb/s and 100Gb/s technology • New maximum capacity 2.7 Tb/s per FP LION LION2 System - Poster Presentation - 24 April 2013

  4. Phase 1 : Building LION Kenya 3 100 km anticipated longest link LION Started service in December 2009 dormant BU La Réunion Madagascar Mauritius 800 km repeatered MSP1+1 protection 280 km unrepeatered MSP 1+1 protection LION LION2 System - Poster Presentation - 24 April 2013

  5. Phase 2: Building LION2 (step 1) Kenya Mayotte LION2 under construction BU connexion was last operation of cable laying La Réunion Madagascar Mauritius LION in service MSP1+1 protection MSP1+1 protection LION LION2 System - Poster Presentation - 24 April 2013

  6. Phase 2: Building LION2 (step 2) Kenya Mayotte LION2 started service in April 2012 using « mesh restoration » protection BU switched to final configuration during commissioning La Réunion Madagascar Mauritius LION in service LION changed to « mesh restoration » protection during LION2 commissioning LION LION2 System - Poster Presentation - 24 April 2013

  7. CABLE PARTNERS A second consortium was established to own the LION2 part of the system Both consortia interact closely and share committees (O&M SC, AR&R SC, PG) LION2 consortium Telkom Kenya LION consortium Société Réunionnaise du Radiotelephone (SRR) Orange Madagascar Mauritius Telecom Orange EMTEL Ltd LION LION2 System - Poster Presentation - 24 April 2013

  8. NECESSARY CARE DURING LION2 DEPLOYMENT • Make sure LION2 deployment operations did not impact LION service operation • Possible causes for impacts were identified… • Connection of the LION2 cable to the dormant BU • Switching BU from LION nominal state to LION+LION2 nominal state • … and mitigated • All LION2 was laid before dormant BU connexion • BU connexion was carried out during low traffic hours • BU was switched to its new nominal state during low traffic hours LION LION2 System - Poster Presentation - 24 April 2013

  9. CHANGING THE PROTECTION SCHEME • Initial Protection scheme : MSP 1+1 • It was well adapted for the initial LION configuration (two point-to-point links) • But it doubled capacity use for the purpose of protection • New protection scheme : Mesh restoration • Based on G-ASON (GMLPS) • Classical ring protection on the repeatered part of the system would double the capacity use (like MSP 1+1) • Classical ring protection is not so interesting for the new configuration (the repeatered part is a small ring with 4 nodes) • Mesh restoration offers very good flexibility • A range of protection level are possible • Protection is managed on a VC4 circuit basis LION LION2 System - Poster Presentation - 24 April 2013

  10. DIVERSITY OF LANDINGS AND CABLE STATIONS • Diversity of landing and station was ensured in all three landings were other cables already existed • Mauritius: diversity w.r.t. SAFE • La Réunion: diversity w.r.t. SAFE • Mombasa: diversity w.r.t. UAE-KENYA, EASSy, SEACOM LION LION2 System - Poster Presentation - 24 April 2013

  11. The LION / LION2 Cable System Diverse landings wrt other cables LION LION2 System - Poster Presentation - 24 April 2013

  12. THE MAYOTTE LAGOON • The Mayotte lagoon contained an area (4 km wide) with many coral outcrops (pinnacles) • Around 30 suspensions were observed in that zone after initial cable lay • All suspensions were sucessfully removed by diver teams LION LION2 System - Poster Presentation - 24 April 2013

  13. KEEPING DELAYS UNDER CONTROL PERMITTING DELAYS • Permitting is a process specific to each country and the date of delivery is often difficult to predict • After an initial phase of overconfidence, unexpected delays were observed for one of the landing permits • We came close to a situation where the cable ship would be held up waiting at the limit of the territorial waters • Better anticipation would have been needed • A more flexible contractual framework with suppliers to handle such situations gracefully • We put in place a plan B for the landing site but it was not needed at the end of the day STATION DELIVERY DELAYS • The station site was depending on the landing site • Therefore we also put in place a plan B for an alternative station site • The delivery of the station was also delayed by the permitting delay • The critical point was the delivery of the final energy supply equipment • System commissioning started with a temporary energy supply setup • Final energy was up and running at the end of the commissioning LION LION2 System - Poster Presentation - 24 April 2013

  14. CONCLUSION • The LION+LION2 system is a consortium-owned cable built in two phases • Moving from LION to LION+LION2 implied a significant context change • Extension of the consortium from 3 to 6 co-owners • Changing the protection scheme • The following challenges were successfully met • Ensure landing diversity for landings and sites providing interconnexion to other cables • Avoid any impact to LION operation when deploying LION2 • Keeping permitting and station delivery delays under control LION LION2 System - Poster Presentation - 24 April 2013