USB On-The-Go Implementation Trade-offs

USB On-The-Go Implementation Trade-offs. Zong Liang WU TransDimension. Agenda. On-The-Go device vs. Dual role device Dual role device: top level architecture Basic issues: system constraints System constraints vs. Implementation choices Compliance & interoperability Product decision.

booker
Télécharger la présentation

USB On-The-Go Implementation Trade-offs

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. USB On-The-Go Implementation Trade-offs Zong Liang WU TransDimension

  2. Agenda • On-The-Go device vs. Dual role device • Dual role device: top level architecture • Basic issues: system constraints • System constraints vs. Implementation choices • Compliance & interoperability • Product decision

  3. On-The-Go Device Vs. Dual Role Device • Dual role device (DRD): • Supports master negotiation protocol • Acts as master or slave, after MNP • Capable of supplying at least 4mA • On-The-Go device (OTG): • Dual Role Device • Slave-only device drawing less than 4mA from Vbus

  4. Dual Role DeviceTop-Level Architecture Charge Pump 5V @4mA Processor Interface System processor HOST Analog Transceiver Cable Function MNP Registers Top level control

  5. Basic IssuesSystem Constraints • Microprocessors • Wide range of performance (uP itself or the part available for DRD) • Different interfaces: often DRD is not allowed to be system bus master • System software • Latency of HW interrupt processing • Maybe critical for Isochronous applications • Different RTOS

  6. System Constraints Vs.Implementation Choices • Performance of the master: • Throughput supported: full 12mbits/s (as good as or even better than a PC) vs. Very limited bandwidth • Endpoint types supported: all 4 types vs. A subset • Number of devices and endpoints supported: capable of supporting many devices/endpoints simultaneously vs. Onlya few endpoints • Difficulties: • How to get maximum master performance with a limited uP? • How to do in embedded applications where DRD is not allowed to be system bus master ? • How to support Isochronous applications within a RTOS having a large interrupt latency (like wince)?

  7. System Constraints Vs.Implementation Choices • uP requirements vs. Master performance: • Desired target for portable or STB applications: • Optimal performance • Light load on uP • Minimum interrupt frequency • Loose requirement on uP’s interrupt latency • Keep at low cost (HW+SW) • Trade-off vs. Smart SW/HW partitioning Learn from OHCI and UHCI partitioning • Call for major architecture innovation

  8. System Constraints Vs.Implementation Choices • Many applications: • Portable (PDA, mobile phone, MP3, pocket PC, digital camera etc)and less portable (set-top-box, game machine, etc): • Many RTOS on the market • RTOS-based stack vs. Dedicated system SW • RTOS is not always necessary • Think of a dedicated microprocessor • RTOS-based: how to design once for all? • Try to comply with and reuse OHCI/UHCI stack • Partner with specialty system software house

  9. System Constraints Vs.Implementation Choices • Power management: • Portable appliances require low power • OTG spec introduces the concept of sessionand wakeup protocol • Manage power at chip architecture level, by introducing appropriate power management logic

  10. System Constraints Vs.Implementation Choices • Single chip vs. 2-chip solution • OTG master needs to supply 5V@4mA (minimum) • Analog transceiver’s signaling is 3.3V • Standard 0.18um process has trouble to implement • Put the charge pump and the analog transceiverinto a separate chip • Define a standard interface: ongoing effort

  11. Compliance & Interoperability • Compliance to WHAT: • A DRD must be a 100% compliant USB function • OTG master vs. Embedded master vs. StandardPC host (OHCI/UHCI): • OTG: one to one: simpler master • Embedded: Strong sales point if the master cansupport what a standard PC host can do(endpoint types, number, sizes) • An OTG compliance spec is in development

  12. Product Decision • What do you really want: • Slave-only with mini-connector and draws <=4ma • Dual role device (master or slave depending on MNP result) • Simultaneous master and slave • Do not forget your expectation on master’s performance • Discrete IC or integrate an IP into your system: • Time to market vs. Cost vs. Risk