An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Environmentally Sustainable Design, Construction, Maintenance, and Operation. Oakland Yacht Club Harbor Reconfiguration

  2. Outline • Purpose • Planning • Permitting • Design Build • Construction • Operations / Maintenance Environmentally Sustainable Design, Construction, Maintenance, and Operation Oakland Yacht Club Harbor Reconfiguration

  3. Purpose:: Convert a large number of smaller, empty berths… to a fewer number of larger (and full) berths

  4. Planning: • Budget • Schedule • Scope of Work

  5. Permitting: • Federal; • State; • Regional; and • Local • Lead Times • Environmental • Consultations

  6. Design Build: • Defined Scope of Work • Control • Schedule

  7. Construction

  8. Dismantle; Offsite Construction; Transportation ; and Assembly

  9. Construction Management

  10. Operations & Maintenance

  11. Lessons Learned: • Specific Project Purpose • Alternatives Analysis during Planning • Specific Scope of Work • Detailed Design Criteria • Long Lead Time for Regulatory Permits • and Natural Resource Consultations

  12. Lessons Learned (cont’d): • Sustainable Design/Build Resulted in: • -Lower Construction Costs; • -Lower Operation / Maintenance Costs • -Timely Permitting • Allow Sufficient Lead Time for Permitting • AGC Document #415, Standard Form of • Design –Build Agreement

  13. Questions?