This document presents the final plan for the collaborative R&D program under the TIARA framework, as outlined by Paolo Pierini on November 26, 2013. The plan includes deliverables that are still pending, with a focus on defining a coherent R&D strategy and necessary infrastructures to validate new technologies and test prototypes. It emphasizes coordination with non-European R&D programs and highlights key accelerator areas, addressing various applications including High Energy Physics (HEP), medical, and industrial needs. The document also lists ongoing projects and emerging ideas.
Final Plan for Collaborative R&D Program in TIARA Framework Presented by Paolo Pierini
E N D
Presentation Transcript
‘Toward TIARA’Final Plan for the collaborative R&D Program WP4 Presented by Paolo Pierini 26/11/2013
Deliverables One still to go TIARA-PP Final
Milestones One still to go TIARA-PP Final
Collaborative Programme • Task 4.3 will propose a coherent collaborative R&D programme to be carried on in the TIARA framework. • 4.3 DAP Definition of the coherent collaborative Accelerator R&D Program and identification of the necessary infrastructures. • This programme will identify the infrastructures needed to validate new technologies and to tests prototypes. The R&D Programme will also ensure appropriate coordination with non European accelerator R&D programs to be established. TIARA-PP Final
KARA/KTI • WP4 work started with the identification of the Key Accelerator Areas and Key Technical Items • Listed in D4.1, updated at MS17 • All KARA/KTI are part of the TIARA potential Workplan • The TIARA R&D Work Plan assembled by agreeing on a number of main R&D topics (“themes”) TIARA-PP Final
Groundwork for Work programme TIARA-PP Final
KARA/KTI & Projects Presented at Madrid mid-Term TIARA-PP Final
Towards TIARA Workplan • The TIARA R&D Work Plan assembled by agreeing within WP4 on a number of main R&D topics (“themes”) • Topics of sufficiently wide interest which aggregate several KARAs and KTIs • Emphasize that R&D items have potential impact on several applications • Address the needs of a broad set of communities • Not only HEP and Nuclear Physics, but also Light Sources, Medical, and Industrial applications • Identify Trends • Ongoing processes to develop EC stategies (ex. ESPP + others), no contrast with those • leads to need of periodic reassessment of workplan TIARA-PP Final
Shortlist/1 • High Energy Frontier • Including Circular Colliders, High energy Linear Colliders, Gamma Colliders, Muon Colliders and Plasma Acceleration Schemes • High Intensity/Luminosity Frontier • Including Spallation Sources, Radioactive Ion Beam Facilities, Higgs Factories, p-bar Factories, Neutrino Factories • Light Sources Development • Including the large variety of schemes under discussion, as Ultimate Rings, FEL-based facilities, 5th generation light sources, ERL-based light sources TIARA-PP Final
Shortlist/2 • Medical Applications • Environmental and Industrial Applications • Accelerator Cost Effectiveness, Energy efficiency & Reliability • Any R&D project enabling major improvements on these topics • Emerging Ideas & Technologies • This may be needed to cover KTIs which may not fall completely in the previous categories TIARA-PP Final
Draft deliverable available ~70% • For each theme we provide • A description of the scope • Class of facilities are encompassed in the topic • The context and the applications • Identify trends of the community interest, if any • A (non-comprehensive) list of projects which are currently ongoing or been planned in this topic on national, European, or international level • Try to highlight specific challenges in each • A list of KARA/KTI’s involved • A list of ARIinvolved • This is still pending, but ARIs will be retrieved from DB by their mapping to KTI TIARA-PP Final
High Energy Frontier • Based on ESPP • Projects mentioned • LHC • CLIC • Future Hadron Colliders • TLEP • LHeC • ILC • Muon • Plasma Colliders TIARA-PP Final
High Intensity • Either • Rare phenomena • High flux for applications • Projects mentioned • ESS • EURISOL • FAIR • IFMIF • Missing • Neutrino factories • ... TIARA-PP Final
Light Sources • Trends • Towards ultimate rings • Soft/Hard Xray FELs and high d.f. (cw) • ERLs • Projects mentioned • ESRF upgrade(s) • MAX IV • XFEL • SWISSFEL • LCLSII • ALICE • BERLINPRO • CORNELL ERL TIARA-PP Final
Medical Applications • Context • Therapy • Facilities • Gantries • Future developements • Radioisotope Production • Listing of existing facilities and proposals, mostly in Eu contexts TIARA-PP Final
Towards TIARA Workplan • What we do not/will not deliver • Priority ranking • Variety of institutions with different goals • Hard to build consensus in this preliminary phase • Discussed several times, but WP4 members feel analysis of priorities is not within our mandate • Costing estimates for KARA/KTI • Huge effort, require the technical expertise across many fields and manpower of several cost engineers to cover all the KTIs TIARA-PP Final
KARA & Workplan mapping DRAFT TIARA-PP Final
Status • Goal: Deliver D4.3 before end of TIARA-PP contract • Status: 70% of the work done (currently 26 pp) • 4 out of 7 «themes» drafted • Editing/Revision in progress • Raw contribution for the «Industrial Application» • Minute notes for drafting «Accelerator Cost Effectiveness, Energy efficiency & Reliability» • As soon a complete draft is assembled, it will be distributed to GC for comments • Approval at next GC during TIARA extension? TIARA-PP Final