1 / 10

Thermal Power Station

Thermal Power Station. Perform Achieve Trade . Thermal Power Plants in PAT - I. Total No of DCs = 144 Threshold limit to be DC = 30,000 tons of oil equivalent (TOE) per annum Total Target Set = 3.1 MTOE . Thermal Power Plant Groups under PAT Scheme. Target Setting in TPPs.

brede
Télécharger la présentation

Thermal Power Station

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Thermal Power Station Perform Achieve Trade

  2. Thermal Power Plants in PAT - I • Total No of DCs = 144 • Threshold limit to be DC = 30,000 tons of oil equivalent (TOE) per annum • Total Target Set = 3.1 MTOE

  3. Thermal Power Plant Groups under PAT Scheme

  4. Target Setting in TPPs • Net Design Heat Rate • Net Operative Heat Rate Net Design Heat Rate= Gross Design Heat Rate 1- APC% operative Net operative Heat Rate = Gross operative Heat Rate 1- APC% operative

  5. Target Setting in TPPs • Heat Rate Deviation (%) • Heat Rate Deviation Heat Rate Deviation (%) = (Operating Heat Rate – Design Heat Rate)x 100 Design Heat Rate Heat Rate Deviation = (Operating Heat Rate – Design Heat Rate)

  6. Target Setting for Reduction of NHR

  7. Correction factor considered for effect on heat rate due to fuel quality • Fuel Linkage and Quality of Fuel • Mixed Fuel where, A= Ash % in Coal M = Moisture % in Coal H = Hydrogen % in Coal GCV = Gross Calorific Value in kcal/Kg Station heat rate (kcal/kWh) = Turbine heat rate/Boiler efficiency (b) The permissible error shall be ±0.05 % in terms of toe for the purpose of determining entitlement of energy savings certificates. Boiler Efficiency = 92.5 – [50*A+630(M+9H)] GCV

  8. Capacity Utilisation and PLF[Plant Performance] • Fluctuation due to Scheduling • Non-availability [Shortage] of Fuel • Shortage of cooling Water

  9. Environmental Standards and Natural Disaster[Gov policy] • Natural disaster • Rioting or social unrest • Change in Environmental Standards • Change in Government policy

  10. Thank you for your patient listening

More Related