An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Agricultural PondPrivate Engineering Resources & Costs Agricultural Water Resource Development Workshops Presented by: Cavanaugh & Associates P.A. 530 N. Trade Street, Suite 302 Winston-Salem, NC 336.759.9001

  2. Why Hire An Engineer? • Is the pond in the best location? • How much water do I need? • How much water will it yield? • Will it hold water? • Which will work - Excavated or embankment? Does it matter? • Are there wetlands? • What about all these permits?

  3. This looks like a good spot! How much water will it yield?

  4. Inflow Hydrograph for Small Watersheds • Need: • Peak Discharge, Qp • Time to Peak Discharge, Tp • Shape of the Hydrograph

  5. The Rational Method Q = CIA(Calculating peak flood discharge at a given point) • Q = estimated design discharge (cfs) • C = Composite Runoff Coefficient for the drainage area • I = Rainfall intensity for the design storm (inches/hour) • A = Drainage Area (acres)

  6. Delineating Drainage Area, A • The first step in determining if your pond is in the “right spot” • Orange Pond A = 25 acres • Blue Pond A = 125 acres • Purple Pond A = 350 acres

  7. Determine Time of Concentration, tc • Depends on • Hydraulic Length of the drainage area • Height of the most remote point on the watershed above the outlet point • Orange Pond tc = 5 min • Blue Pond tc = 7 min • Purple Pond tc = 8.3 min

  8. Determine Rainfall Intensity, I • Depends on • Statistical rainfall for the design location • Designated return period for the design

  9. Determine Composite Runoff Coefficient, C Wooded, Deep Ground Litter, C = 0.10 Wooded, Sparse Ground Litter, C = 0.20 • Depends on land use in the drainage area • Building types • Ground coverings • Soil types • Building densities Commercial, C = 0.85 Apartments, C = 0.60 Residences, 2 dwellings per acre, C = 0.35

  10. Time to Peak, Tp • Based on Qp & Volume of Water Under the Hydrograph • Qp is estimated by Rational Method • Volume is estimated based on • duration of the design storm • Soil types • Cover conditions

  11. Shape of the Hydrograph • Accepted practice is to assume a step function unit hydrograph to estimate the shape

  12. Use the Inflow Hydrograph to determine if the pond is sufficient for your needs.

  13. Excavation Ponds • Is there adequate drainage to fill? • What is the level of the water table? • What is the impact of the water table? • Will the soil types sustain water storage? Source: Dwane Jones/NCSU Co-op Extension

  14. Embankment Ponds • Is there adequate drainage to fill? • Will the soil types sustain water storage? • Is an earthen dam adequate? • What type of outlets are needed? • What is the downstream impact? Source: Dwane Jones/NCSU Co-op Extension

  15. Embankment Earthen Dams • Built in natural topographic draw • Low flow outlet device • Riser/Barrel Outlet • Emergency spillway • Outlet size calculated using Stage-Storage Function to control pond level and downstream needs • Dam Construction must meet Dam Safety Requirements

  16. General Steps in Pond Design • Base Topography • Existing Conditions • Height of Dam Required • Earthwork Required • Geotechnical Investigation • Dam Core Design • Seepage Control • Compaction & Materials Testing

  17. General Steps in Pond Design • Hydrologic Design • Rainfall Event Investigation • Peak Discharge • Watershed Yield/Water Supply • Hydraulic Design • Primary Spillway Design • Riser/Barrel Design • Emergency Spillway Design • Overtopping Control

  18. Construction Considerations • Preparation of Construction Documents • Plans & specifications to be sealed by Professional Engineer • Permits required from NC Division of Land Quality/Dam Safety • Bid Acquisition • Qualifying construction contractors • Hold bid opening • Ensuring contractor has proper bonds • Construction Administration • On-site observation of construction to protect investment and safety • Engineer certification of construction and as-builts

  19. What’s the Engineering Cost? • Site dependant • Two phases: • Preliminary Site Evaluation • Design: Engineering Design, Permitting & Construction Document Preparation • Rough estimate of design cost is 15-20% of construction cost • Preliminary engineering evaluation • Preliminary hydraulic & hydrologic calculations • Cost estimate of geotechnical & wetland investigations • Preliminary design concept • Preliminary cost estimate of engineering costs, permitting fees and construction costs

  20. Why Hire An Engineer? • Professional recommendation on construction alternatives • Familiar with Dam Safety Rules and other permitting needs • Protect your interest during construction • Reduce your liability and risk • In long run will save money and time