1 / 28

Flexible Budget and Standard Costing for Performance Control

TOPIC 10. Flexible Budget and Standard Costing for Performance Control. Flexible Budget Introduction…. Budget can provide a useful basis for exercising control over the business. Budget represents the plan of the business. We do things according to what we plan.

Télécharger la présentation

Flexible Budget and Standard Costing for Performance Control

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TOPIC 10 Flexible Budget and Standard Costing for Performance Control yus/sem1/2004/2005

  2. Flexible BudgetIntroduction….. • Budget can provide a useful basis for exercising control over the business. • Budget represents the plan of the business. • We do things according to what we plan. • We compare our performance with what we plan. • Then, we exercise control by finding out where and why things did not go according to our plan. • One reason why things may not have gone according to plan is that the plans may in reality prove to be unachievable and it needs to be revised. yus/sem1/2004/2005

  3. Cont…. • Budgets may prove to be totally unrealistic targets for a variety of reasons: • Unexpected changes in the commercial environment • Reduction in demand for services or product • Increase or decrease in price or cost of product and material used • Thus we have to flexing the budget (adjusting the budget) before comparison of the actual performance with the budget can be done. yus/sem1/2004/2005

  4. Comparing the actual result • Can be done using fixed budget basis or flexible budget basis • Fixed budget basis means that the actual result are compared with the original budgets • Flexible budget is an original budget that has been amended to take into account the actual level of activity • A flexible budget provides estimates of what costs should be for any level of activity within a specified range. yus/sem1/2004/2005

  5. Example: The following are the budgeted and actual profit and loss accounts for Bexter Ltd.for the month of May: yus/sem1/2004/2005

  6. Comparison results • The budgeted profits was not achieved. • The performance looks bad • The business is out of control • However, cost of labor was less then budgeted, which is good • But still, senior management must find where things when wrong and why? What is the problem in the comparing process??? yus/sem1/2004/2005

  7. The problem is….. • The actual level of output was not as budgeted • The actual level of output was 10% less then budgeted figure. • We cannot say that there were labor cost saving of RM2,500 or increased in direct material costs of RM 150. yus/sem1/2004/2005

  8. Flexing the budgeting figure… • More valid comparison between flexed budget and actual. • Change the volume of production and sales to reflect the volume which actually occurred • Only variable item is changed when the volume changed Flexed Budget 900 units 90,000 (36,000) 36,000 meters (18,000) 4,500 hours 16,000 yus/sem1/2004/2005

  9. Comparison results • The budgeted profits was achieved. • Is the performance good???? • Sales increase because increase in selling price ( RM94,500/900 units = RM105) • Cost of material increase – unit used is higher then budgeted • However, labor was efficient – less hour consumed then budgeted yus/sem1/2004/2005

  10. STANDARD COSTING yus/sem1/2004/2005

  11. STANDARD COSTINGIntroduction……. • Standard costing, along with budgeting is one of the key aspects of planning and control • Standard costing is a sophisticated form of budgeting based on predetermined costs for cost elements such as direct labor or direct material • In standard costing, expected (or standard) sales or costs are compared against actual sales or costs • Any different between them (called variances) are then investigated. yus/sem1/2004/2005

  12. Nature of Standard Costing • Standard costing was originally developed in manufacturing business in order to control costs • It is a predetermined calculation of cost that should be incurred in making the product. • For example; a table to be made may requires 8 hours of direct labor and 3 meters of wood. This becomes the standard quantities for making a table • After a table is made, the actual direct labor and direct material used will be compared with the standard costs. • The differences, then, will be investigated. yus/sem1/2004/2005

  13. Purpose of Standards • To Improve Planning and Control • To Facilitate Product Costing yus/sem1/2004/2005

  14. Information required to operate standard costing…. • Direct material; type, quantity and price • Direct labor;grade, numbers and rates of pay • Variable overhead • Fixed overhead yus/sem1/2004/2005

  15. Example 1: • Alan Carpenter runs a furniture business. In May he makes a Dining table. Below are the detail quantity and costs incurred to make the 1 unit of dining table • Direct material used: 3 meters of wood • Direct labor hours spend: 8 hours • Cost for 1 meter wood RM25 • Cost for 1 hour labor= RM8 • Variable overheads = RM5 x 8 hours • Variable overhead was absorbs on the basis of direct labor hours • Fixed overhead RM240 for 10 unit tables • Calculate the standard costs per unit to make the dining table. yus/sem1/2004/2005

  16. Standard Cost Sheet Dining table Standard Standard Standard Description Price Usage Cost Direct materials RM25 x 3m. = RM75 Direct labor RM8 x 8 hours = RM64 Variable overheads RM5 x 8 hours = RM40 Fixed Overheads costs =RM24 Total Standard unit cost RM 203 yus/sem1/2004/2005

  17. Comparing Standard cost and Actual Cost • Control on costs can be made by comparing standard cost with actual cost incurred • When our actual price/costs and actual quantity vary from standard, we will have price and quantity variances. • Price variances are caused when the standard price differ from the actual price • Quantity variances are caused when standard quantity differ from the actual quantity used. • Favorable variances are where we have done better than expected • Unfavorable variance are where we have done worse than expected yus/sem1/2004/2005

  18. Type of variances • Variance of Direct Material Cost • Price and quantity used • Variance of Direct Labor Cost • Rate and efficiency variances • Cost Variances • Variance of Variable Overheads Cost • Expenditure and efficiency • Variance of Fixed Overheads Cost • Sales Variance • Price and Sales volume yus/sem1/2004/2005

  19. Example: • The following information has been taken from the record of the Frost Production for the year to 31 March 2004 • Budget costs per unit output: • Direct material (15 kg x RM2/kg) = RM30 • Direct labor (10 hours x RM4/hour) = RM40 • Variable overheads cost (10 hours x RM1/hour) = RM10 • The following budgeted data are also relevant: • The budgeted production level was 100 units • Total standard direct labor hours was amounted to 1000 • Total budgeted variable overhead was estimated to be RM1000 • Total budgeted fixed overhead was RM2000 • The product can be sold at RM150/unit • Actual costs: • Direct material RM2100 • Direct labor RM4000 • Variable overhead RM1000 • Fixed overhead RM1600 • Total actual cost RM8700 • Note: 90 unit were produced in 800 actual labor hours, and the total actual quantity of direct materials consumed was 1400kg. 90 units were sold at RM160/unit • Prepare fixed budget for 100 unit and flexing the budget for 90 units produced and sold • Calculate cost and sale variances yus/sem1/2004/2005

  20. Total sales variance Selling price variance Sales volume profit variance Sales Variance • Selling Price (PV)= (Actual selling price per unit – standard selling price per unit) x actual units sold • Sale volume profit = (total quantity sold – budgeted quantity sold) x standard profit per unit* *standard profit per unit = selling price per unit – standard cost per unit • Total sales variance = selling price variance + (-) sales volume profit variance yus/sem1/2004/2005

  21. Sales Variance • Selling Price (PV)= (Actual selling price per unit – standard selling price per unit) x actual units sold = (RM160 – RM150) x 90 units = RM10 x 90 units = RM900 (F) • Sale volume profit = (total quantity sold – budgeted quantity sold ) x standard profit per unit* = (90 units –100 units) x RM50 = 10 units x RM50 = RM500 (U) *standard profit per unit = budgeted selling price per unit – standard cost per unit RM150- RM100 = RM50 yus/sem1/2004/2005

  22. Variance of Direct Material Cost • Price (PV)= (Actual cost per unit – standard cost per unit) x Total actual quantity used • Quantity (QV) = (total quantity used – standard quantity for actual production ) x standard cost • Total Cost =( standard cost for actual production – actual cost of material used in production) yus/sem1/2004/2005

  23. Price (PV)= (Actual cost per unit – standard cost per unit) x Total actual quantity used = (Actual cost/actual Qtty – RM2 ) x 1400kg = (RM2100/1400kg – RM2 )x 1400kg = (RM1.50 – RM2) x 1400kg = RM700 (F) Quantity (QV) = (total quantity used – standard quantity for actual production ) x standard cost = (1400kg – 15kg x90 unit ) x RM2 = (1400kg – 1350kg) x RM2 = (50kg) x RM2 = RM100 (U) yus/sem1/2004/2005

  24. Total Cost Variance =( standard cost for actual production – actual cost of material used in production) = (RM2 x 15kg x 90 units) – RM2100 = RM2700 – RM2100 = RM600 ATAU Total Cost Variance = Price Variance -/+ Quantity Variance = RM700 (F) – RM 100 (U) = RM600 yus/sem1/2004/2005

  25. Variance of Direct Labor Cost • Rate (RV)= (Actual hourly rate – standard hourly rate) x Total actual hour work • = (total hour worked – standard hour worked for actual production ) x standard hourly rate • Total Cost = (actual hour work x actual rate) – (Standard hour for actual production x standard rate) Efficiency (EV) yus/sem1/2004/2005

  26. Rate (RV)= (Actual hourly rate – standard hourly rate) x Total actual hour work = (Actual cost/actual hour – RM4 ) x 800 hours = (RM4000/800 hours – RM4 )x 800 hours = (RM5 – RM4) x 800 hours = RM800 (U) = (total hour worked – standard hour worked for actual production ) x standard hourly rate Efficiency (EV) = (800 hours – 10 hours x 90 units ) x RM4 = (800 hours – 900 hours) x RM4 = (100 hours) x RM4 = RM400 (F) yus/sem1/2004/2005

  27. Total Cost = (actual hour work x actual rate) – (Standard hour for actual production x standard rate) = (800 hours x RM5 ) – (10 hours x 90 units) x RM4 = RM 4000 – RM3600 = RM400 (U) ATAU Total Cost Variance = Rate Variance -/+ Efficiency Variance = RM800 (U) -+ RM 400 (F) = RM400 (U) yus/sem1/2004/2005

  28. Conclusion • A standard cost id the planned cost of a particular unit or process • Standard costs are usually based on what is reasonably attainable • Actual costs are then compared with standard costs • Corrective action is taken if there are any unplanned trends • Variance analysis is an arithmetical exercise that enables differences between actual and standard cost to be broken down into the elements of cost • The variances help in tracing the main cause of differences between actual and budgeted results, but they do not explain what has actually happened yus/sem1/2004/2005

More Related