1 / 14

Manage-2000 7.1 Upgrade

Manage-2000 7.1 Upgrade. The Real Story. Manage-2000 7.1 Upgrade – The Real Story Cost. Epicor Services and Cost Your “Upgrade” is free. All you have to do is install it, or have someone install it.

bryant
Télécharger la présentation

Manage-2000 7.1 Upgrade

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Manage-2000 7.1 Upgrade The Real Story

  2. Manage-2000 7.1 Upgrade – The Real StoryCost • Epicor Services and Cost • Your “Upgrade” is free. All you have to do is install it, or have someone install it. • Epicor offers a “flat fee” upgrade based on how many “.MAIN” accounts you have. This “flat fee” would not include custom code. - $8000 for 1st .MAIN, and then $225 / hour for additional.

  3. Manage-2000 7.1 Upgrade – The Real StoryCost • Duel Release or Development Server • If UNIX – Duel Release if your current release is compatible. (Meaning HP/UX 11) If your not current you have options: • Upgrade your current Manage-2000 to HP/UX 11 • Buy a new server for cutover testing • If NT/2000 – Development Server • Hardware - $1,000-2000 and UP • Windows - $700 • Manage-2000 Licenses. (For example buy more, or move unused.) Again, your CAM can give you specific samples of your costs. – Enterprise Seat: $2,900 • Manage-2000 “Disaster Recovery License” Enterprise - $1,700 • If you do not add licenses, you will need to move them from your production server. (Know how many you have, and how many you need)

  4. Manage-2000 7.1 Upgrade – The Real StoryCost • Custom Code • A custom code audit can reveal how much custom code you currently have. For an actual upgrade this is required. • Consider removing all custom code, and re-justifying the need for it thru testing. Re-custom as justified. • Custom code can become the most expensive component of your upgrade very easily. • Custom code is billed BY THE HOUR. • Epicor now offers support for custom code. Meaning you get it as part of your upgrade. The cost for this is 20% of the custom code cost.

  5. Manage-2000 7.1 Upgrade – The Real StoryCost • New Requirements (Depending on your current release) • Redback (Some on 7.0 have it, Nobody on 6.x does) • Required to serve up “Portals” • LOOK.SO, LOOK.PO, ACTIVITY, STOCK, Etc etc etc • A Redback Responder consumes a UniData and Manage-2000 license. - $4,500 • Each .MAIN or .TRAIN account needs its own responder. • Each Account can also have multiple responders depending on your load. • The “Official” number is 1 responder for every 10 users. • Brinly is using 1 responder for 40 users.

  6. Manage-2000 7.1 Upgrade – The Real StoryCost • New Requirements (Depending on your current release) • A Web Server - $1000-$2000 and up plus $700 for Windows. • Required to serve up “Portals” • Must be Windows 2000 or 2003 Server. (No matter what your Data server is running. For example, UNIX still needs a Windows web server.) • Should have loads of RAM. (read: cram as much RAM in there as your budget can afford) • Should not be on the same server as the Database Server. • Can host multiple .MAIN and .TRAIN accounts on 1 host.

  7. Manage-2000 7.1 Upgrade – The Real StoryCost • New Requirements (Depending on your current release) • Visual Studio .NET - $645 • Required if you want to change things in the Portals • Infragistics - $495 • Also Required if you want to change things in the Portals. • Provides many UI elements in portals. • Menus, Buttons, etc etc.

  8. Manage-2000 7.1 Upgrade – The Real StoryCost • New Requirements (Depending on your current release) • Enterprise License • Allows you to use Manage-2000 in a device mode instead of a session mode. • Each device can use up to 10 sessions using 1 seat or license. • PWS • Delphi • EpiEdit • Keep in mind that the Portals are driven thru Redback and it consumes its own seat as outlined before. (20 users in a portal are still 1 seat)

  9. Manage-2000 7.1 Upgrade – The Real StoryBenefits • Portals – Information is linked. • Less Delphi – Mostly only .CONSTANTS now. • Propaganda: • A2K - $15,000 • Clientele • Optio - $10,400 • FEATURE.SUMMARY Review. • fs_7_1.pdf

  10. Manage-2000 7.1 Upgrade • Break Time

  11. Manage-2000 7.1 Upgrade – Unix vs NT • UNIX Benefits • Configuration is more flexible. • One host can run multiple versions of Manage-2000 • System scales up easier (100+ users) • More acceptable to open source.

  12. Manage-2000 7.1 Upgrade – Unix vs NT • UNIX Cons • System hardware is more costly. • Requires another level of knowledge (UNIX) • Does not integrate easily into Windows environment.

  13. Manage-2000 7.1 Upgrade – Unix vs NT • Windows Benefits • Configuration is easier. • Mostly point and click. • Management is easier. • Integrates into existing windows network easily. • Hardware is cheap, and can use standard PC components.

  14. Manage-2000 7.1 Upgrade – Unix vs NT • Windows Cons • Windows does not offer some of the same level of “detail” as a UNIX host does. • Windows does not scale well on very high user count sites. • There are more windows hackers than unix hackers.

More Related