Factoria. Recycling and Transfer Station. Factoria Recycling and Transfer Station Facility. SWAC 06-15-2012. Factoria. Recycling and Transfer Station. Program and Project History
E N D
Factoria Recycling and Transfer Station Factoria Recycling and Transfer Station Facility SWAC 06-15-2012
Factoria Recycling and Transfer Station • Program and Project History • 2007 SWD Transfer and Waste Management Plan provided a blueprint for the future of the King County’s solid waste management system. • Recommended replacing Factoria Transfer Station with a new facility at the same site or alternative location in Bellevue. • Decision made to locate new facility at the same site. SWAC 06-15-2012
Factoria Recycling and Transfer Station Current Conditions • Constructed in the mid-1960s • Limited space and services • No recycling services • Constrained household hazardous waste (HHW) service area • Inadequate roof clearance • Inadequate floor space SWAC 06-15-2012
Factoria Recycling and Transfer Station SWAC 06-15-2012
Factoria Recycling and Transfer Station Project Goals • Work with City of Bellevue and other Stake Holders • Add recycling function • Operate during construction • Enclosed building, strive for LEEDTM Gold • Improved refuse compaction, allowing greater payload and transportation efficiency • Improved traffic flow • Design for future flexibility • Schedule and budget compliant SWAC 06-15-2012
Factoria Recycling and Transfer Station SWAC 06-15-2012
Factoria Recycling and Transfer Station SWAC 06-15-2012
Factoria Recycling and Transfer Station Area Reductions in Factoria RTS Facility Design SWAC 06-15-2012
Factoria Recycling and Transfer Station 30 Percent Design SWAC 06-15-2012
SE 30TH STREET DECONSTRUCTION OF EXISTING WAREHOUSES Existing Scale House SE 32nd STREET
SE 30TH STREET TRAILER PARKING TRANSFER STATION RECYCLING SELF-HAUL COMMERCIAL ADMINISTRATION BUILDING Existing Scale House SE 32nd STREET Site Plan 30 Percent Design
SE 30TH STREET TRAILER PARKING TRANSFER STATION RECYCLING SELF-HAUL COMMERCIAL DECONSTRUCTION OF EXISTING TRANSFER STATION AND GRADING ADMINISTRATION BUILDING Existing Scale House SE 32nd STREET Site Plan 30 Percent Design
SE 30TH STREET TRAILER PARKING TRANSFER STATION RECYCLING SELF-HAUL COMMERCIAL HOUSEHOLD HAZARDOUS WASTE ADMINISTRATION BUILDING SE 32nd STREET Existing Scale House Site Plan 30 Percent Design
Factoria Recycling and Transfer Station SWAC 06-15-2012
Factoria Recycling and Transfer Station TRAILER YARD COMMERCIAL SELF HAUL RECYCLING TRANSFER STATION HOUSEHOLD HAZARDOUS WASTE ADMINISTRATION BUILDING SE 32ND STREET SWAC 06-15-2012