1 / 28

Gunnison Basin Implementation Plan Presentation to the Colorado Water Conservation Board

Gunnison Basin Implementation Plan Presentation to the Colorado Water Conservation Board July 16 , 2014. The GBIP in a Nutshell: Approach. Solid guidance from GBIP subcommittee Minor restructuring to address local issues and flow Targeted technical outreach

caia
Télécharger la présentation

Gunnison Basin Implementation Plan Presentation to the Colorado Water Conservation Board

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Gunnison Basin Implementation Plan Presentation to the Colorado Water Conservation Board July 16, 2014

  2. The GBIP in a Nutshell: Approach • Solid guidance from GBIP subcommittee • Minor restructuring to address local issues and flow • Targeted technical outreach • GBRT assistance with public outreach • Avoid duplication of previous efforts

  3. The GBIP in a Nutshell: Content • Primary Goal: Protect Existing Uses • Focus on Agricultural Shortages • Agricultural Shortages = Agricultural Gap • Focus on Modeling • Tiered & Combined Project List

  4. Draft Plan Overview

  5. Comparison to CWCB Guidance

  6. Introduction • Overview of the Gunnison Basin • Layout and Land Ownership • Hydrology and Water Management • Water Rights Administration • Environmental Flow Management • Water Quality and Watershed Management • Water Related Recreation • Economic Impacts of Water Use • Overview of the Gunnison Basin Implementation Plan • Purpose • Outreach Process • Report Structure • Overview of Available Basin Information • Modeling Tools • Basin Studies

  7. Section 1: Basin Goals • Introduction • Basin Goals • Statewide Principles

  8. Basin Goals

  9. Statewide Principles

  10. Section 2: Basin Needs • Introduction • Agricultural Needs • Summary of Process • Recent Updates (Including Drought Study Impacts) • Summary of Needs • Municipal and Industrial Needs • Summary of Process • Recent Updates (Including Drought Study Impacts) • Summary of Needs • Environmental and Recreational Needs • Summary of Process • Recent Updates (Including Drought Study Impacts) • Summary of Needs

  11. Section 2: Basin Needs – Ag Shortages

  12. Section 3: Basin Evaluations • Introduction • Gunnison Basin Water Resources Allocation Model • Case Studies • Water Availability Analysis (Historical Hydrology) • Water Availability Analysis (CRWAS Projected Climate Hydrology) • Upper Basin Supplemental Irrigation Decrees • Multipurpose Win-Win Projects • Instream Flow Analysis • Mapping Overlays

  13. Case Study Example – Historical Hydrology

  14. Case Study Example – CRWAS Projected Climate Hydrology

  15. Case Study Example – Instream Flow Analysis

  16. Section 4: Basin Projects • Introduction • Project Lists • Planned Projects • Environmental Protections and Monitoring • Completed and Ongoing Projects • Project Summary Template • Project Summaries (Planned Projects)

  17. Section 4: Projects to Highlight • Tier 1: Implementation likely feasible by 2020; project does excellent job of meeting Basin Goals. • Tier 2: Implementation likely not feasible by 2020; project would excel at meeting Basin Goals. Project may also have important conditional water rights and/or completed planning efforts. • Tier 3: Implementation likely not feasible by 2020; project in preliminary stages of planning and/or may meet Basin Goals to lesser degree.

  18. Section 4 – Planned Project List • Started with most recent SWSI list – new & refined • Projects assessed for: water availability, feasibility, and competition for same water • Modeling analysis as requested • Large variability in project data • Significant effort in data collection • Proposed inventory projects • Inventory, assessment, and prioritization • Address infrastructure needs

  19. Section 4 – Planned Project List

  20. Project Summary Sheets

  21. Example - Project Specific Analysis

  22. Section 5: Conclusions & Recommendations • Introduction • Conclusions • Basin Goals • Basin Needs • Basin Evaluations • Basin Projects • Project Effectiveness in Meeting Goals and Measurable Outcomes • Recommendations (Implementation Strategies) • Project Acceptance • Project Feasibility

  23. Project Effectiveness per Goals

  24. Recommendations: Strategies Tied to Constraints

  25. GBIP Status • On schedule and on budget • GBRT review of 2 full drafts (tracking changes) • Incorporating final comments • Final draft comment deadline this Friday (7/18/14) • GBIP Subcommittee Meeting: 7/29/14 • Submittal to CWCB: 7/31/14 • No current plans for further funding

  26. Questions?

More Related