Transmission Cost Estimates for 25 MW Project at Great Falls 230 Switch Yard
This report outlines the cost estimates for the transmission services related to a 25 MW project injecting power at the Great Falls 230 Switch Yard. It assumes optimal conditions for connection. If the project connects at one of the 100 kV lines in the southern Great Falls transmission system, it may require significant upgrades, including re-conductoring of these lines to accommodate the additional load. Understanding these costs is essential for project planning and financial forecasting.
Transmission Cost Estimates for 25 MW Project at Great Falls 230 Switch Yard
E N D
Presentation Transcript
Balancing Authority Area Transmission Service Cost Estimates No GF WAPA So GF B-M E Bil Boz-Bil
Transmission Cost AttributableTo 25 MW Project 1. Assumes the project is injecting its power a the Great Falls 230 Switch Yare. Should a project connect on one of 100 kV lines in the south of Great Falls transmission system, there is a likelihood that the 100 kV would need to be reconductored.