1 / 10

Three stages to grant a licence 1st stage : Grant of generation licence

North Aegean Region Planning and Divelopment Directory Renewable Energy Sourses investments in the N. Aegean. Potential and problems.

calder
Télécharger la présentation

Three stages to grant a licence 1st stage : Grant of generation licence

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. North Aegean RegionPlanning and Divelopment DirectoryRenewable Energy Sourses investments in the N. Aegean.Potential and problems

  2. According to the “Planning and Divelopment Directory” obligations, concerning Renewable Energy Sources are apointed as :1. Management of Renwable Energy Sources, such as wind energy, solar and waterfalls2. The lease of geothermal fields for power uses

  3. Three stages to grant a licence 1st stage : Grant of generation licence by R.A.E. 2nd stage : Grant of installation licence by D.P.D (N. Aegean Region) 3rd stage : Grant of operation licence by D.P.D (N. Aegean Region)

  4. Wind Energy Generation Licences Lesvos Perfecture

  5. Wind Energy Generation Licences Chios Perfecture

  6. Wind Energy Generation Licences Samos Perfecture

  7. Distribution of Wind Energy Power

  8. Categories of investors • Indipendent investors • Town corporations • Collaborations between indipendent investors and town corporations. • D.E.H.

  9. Problems/Difficulties • The low power rate produced by the R.E.S. • The need to notify a new connection network, such as to support the power conveyance. • Substantial delay in order to issue some supporting documents. • The legislative framework for the lease of geothermal fields.

More Related