An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IENG 451 JIT

  2. Production Physics • Little’s Law Throughput = WIP/Cycle time • For fixed capacity, cycle time and WIP or proportional – thus you can increase throughput either by increasing WIP or by decreasing cycle time

  3. Production Physics • Law of variability – increasing variability inevitably degrades the performance of the system • Law of variability buffering – variability in a production system will be buffered by some combination of inventory, capacity, or time

  4. JIT Principles • Don’t produce something unless a customer has ordered it • Level demand so that work may proceed smoothly throughout the plant • Link all processes to customer demands through visual tools (kanbans) • Maximize the flexibility of people and machinery

  5. Pull Systems • Nobody upstream produces a good or a service until somebody downstream asks for it

  6. Pull Systems • Nobody upstream produces a good or a service until somebody downstream asks for it

  7. Pull Systems • Nobody upstream produces a good or a service until somebody downstream asks for it

  8. Kanban Rules • Never ship defective items • Customer withdraws only what is needed • Produce only quantity withdrawn by the customer • Level production • Use kanban to fine-tune production • Stabilize and strengthen the process

  9. Production orders • Batch of 10 vs Batch of 100 • Adjust more quickly to demand • Better sense of takt time • Fewer peaks and valleys • Better control of abnormality production

  10. Pull Systems • Type A • Frequent orders with short lead times, most common, replenishing gaps created in the finished goods storage • Type B • Infrequent orders or long lead times, pacemaker is usually midstream • Type C • Combination of type A and type B running in parallel

  11. Value Stream Mapping • VSM helps grasp current condition and identify improvement opportunities

  12. VSM Steps • Determine the individual product or service you will map • Draw the process flow

  13. VSM Steps • Add material flow

  14. VSM Steps • Add Information flow

  15. VSM Steps • Collect process data and connect it to boxes on chart • Add process and lead times