Technical Standards Committee meeting

Technical Standards Committee meeting. SEGD & SPS Revision Goals. Establish consistency between SEGD and SPS Source line and source point numbers Receiver line and receiver point numbers File numbers Handle “large” file numbers

Télécharger la présentation

Technical Standards Committee meeting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Technical Standards Committee meeting

  2. SEGD & SPS Revision Goals • Establish consistency between SEGD and SPS • Source line and source point numbers • Receiver line and receiver point numbers • File numbers • Handle “large” file numbers • Handle “large” channel counts consistent with modern recording systems • Maintain 80 column format of current SPS • Maintain limited backwards compatibility

  3. SPS Review

  4. SPS X (relational file) relational record specification Item definition of field cols format min. to max default just. 1 record identification 1 – 1 1 - 1 A1 A1 "x" "x" none n/a record identifier: unchanged. 2 field tape number 2 – 7 2 - 7 3A2 3A2 free free none right field tape number: unchanged *3 field record number 8 – 11 8 - 15 I4 I8 0 to 9999 0 to 16777216 none right field record number: expanded to i8 to be compatible with SEGD. 4 field record increment 12 – 12 16 - 16 I1 I1 1 to 9 1 to 9 1 right field record increment: unchanged. 5 instrument code 13 – 13 17 - 17 A1 A1 1 to 9 1 to 9 1 right instrument code: unchanged. 6 line name 14 – 29 18 - 27 4A4 F10.2 free -999999.99 to 9999999.99 none left line name: to be compatible with the SEGD format. 7 point number 30 – 37 28 - 37 2A4 F10.2 free -999999.99 to 9999999.99 none right point number to be compatible with the SEGD format. 8 point index 38 – 38 38 - 38 I1 I1 1 to 9 1 to 9 1 right point index: unchanged

  5. SPS X (relational file) Cont’d *9 from channel 39 – 42 39 - 43 I4 I5 1 to 9999 1 to 99999 none right from channel: format changed from i4 to i5, to handle larger channel counts (100000 actives channels) *10 to channel 43 – 46 44 - 48 I4 I5 1 to 9999 1 to 99999 none right to channel: format changed from i4 to i5, to handle larger channel counts (100000 actives channels) 11 channel increment 47 – 47 49 - 49 I1 I1 1 to 9 1 to 9 1 right channel increment: unchanged. 12 line name 48 – 63 50 - 59 4A4 F10.2 free -999999.99 to 9999999.99 none left line name: to be compatible with the SEGD format. 13 from receiver 64 – 71 60 - 69 2A4 F10.2 free -999999.99 to 9999999.99 none right from receiver: to be compatible with the SEGD format. 14 to receiver 72 – 79 70 - 79 2A4 F10.2 free -999999.99 to 9999999.99 none right to receiver: to be compatible with the SEGD format. 15 receiver index 80 -80 80 - 80 I1 I1 1 to 9 1 to 9 1 right receiver index: unchanged.

  6. SPS S & R (Point file) definition of field cols format min. to max default just. units record identification 1-1 1-1 A1 A1 “s” or “r” “s” or “r” none n/a record identification: unchanged. line name 2-17 2-11 4A4 F10.2 free -999999.99 to 9999999.99 none left line number: to be compatible with the SEGD format. point number 18-25 12-21 2A4 F10.2 free -999999.99 to 9999999.99 none right point number: to be compatible with the SEGD format. point index 26-26 I1 1 to 9 1 right point index: (source and receiver)point record specification All other fields remain the same

  7. SEGD Review

  8. SEGD Review • File number Use of the extended file number currently available should suffice until SEG-E 1 – 16,777,216 • Channel number Use multiple channel sets - 9999 channels per set • X,Y,Z and T and flag To permit the recording of individual vibrator locations for individual sweeps for HFVS and similar vibrator operations.Since the recorded vibrator signals (BP, RM & GF) will be recorded in the auxiliary channels we propose recording the position information in the aux channel headers. The flag (pre-plan, surveyed, actual…..) can also be recorded in the header. • Uphole time Should be recorded in the auxiliary channel header that corresponds to the recorded uphole signal (0 – 99ms to be consistent with SPS) • General Header Needs to include all topographical survey information required for correct positioning: datums, map projections, transformations, etc … Or .. Use reference to database from PetroConsultants http://www.remotesensing.org/geotiff/proj_list/guid7.html