1 / 19

Project Xxx

Project Xxx. Final Design Review. Project Xxx Core Team. Decisions requested Issues from previous Stage Results of Engineering Tests Results of System Tests Technical Readiness Status/results of Alpha Tests Status/results of Beta Tests Open known bugs Design freeze

cannona
Télécharger la présentation

Project Xxx

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project Xxx Final Design Review Project Xxx Core Team Atrica Confidential – NDA Required – Do Not Duplicate or Redistribute

  2. Decisions requested Issues from previous Stage Results of Engineering Tests Results of System Tests Technical Readiness Status/results of Alpha Tests Status/results of Beta Tests Open known bugs Design freeze Agency certification Release notes and SW install/upgrade readiness Manufacturing Readiness Manufacturing Process Materials Readiness Finance Updated product cost/GM Risk and risk management Decisions requested Agenda Atrica Confidential – NDA Required – Do Not Duplicate or Redistribute

  3. Decisions requested • Outline here the decisions which are requested at the end of this FDR meeting Atrica Confidential – NDA Required – Do Not Duplicate or Redistribute

  4. Engineering Tests • Outline the status and key results of the engineering tests (bugs identified / corrected, outstanding issues) for the following tests • Functional test • Performance test • HALT test • PHy test • Negative tests • Functional Load / Stress tests • Black box testing / ATP • Mechanical / Environmental tests • Pre-compliance tests (EMC, Safety) • User guidelines review • SW installation and upgrade procedure tests Atrica Confidential – NDA Required – Do Not Duplicate or Redistribute

  5. System/Alpha Tests • Outline here the status and key results of System and Alpha tests and the tested versions • Results of the scalability and Interoperability tests • Versions tested • Bugs identified / corrected • Results of the tests with ATM products from other divisions • Versions tested • Bugs identified / corrected • Results of the Large Networks / System tests • Versions tested • Bugs identified / corrected • Results of the last test cycle (Alpha) • Result of Release Notes verification • Result of SW installation/Upgrade documentation and procedures • Hot system tests results and Outstanding issues Atrica Confidential – NDA Required – Do Not Duplicate or Redistribute

  6. Beta Tests • Outline client base used for Beta Tests • List of Beta sites • Tested version + product configuration • Type of network environment • Outline here the status and key results of the Beta tests • Major feedback • Positive feedback • Problems encountered • Actions taken • Outstanding issues • Release notes verification • SW installation/Upgrade verification Atrica Confidential – NDA Required – Do Not Duplicate or Redistribute

  7. Open known bugs • Insert here graph report from Clear Quest • Figure of Merit chart Atrica Confidential – NDA Required – Do Not Duplicate or Redistribute

  8. Selected criteria for moving forward • List here the criteria which are used to assess whether the product can be released to 1st Production build Atrica Confidential – NDA Required – Do Not Duplicate or Redistribute

  9. Design freeze • Specify the latest modifications made to the design • Taking into account bugs found during Alpha and Beta tests • Taking into account potential changes requested by the Certification Agency (if any) • Confirm that current design meets requirements from other functions • CSO (design in line with Serviceability requirements) • Manufacturing (design in line with Manufacturability requirements) • Test (design in line with Testability requirements) • Check readiness of design to be used for 1st production build • Are the files to be used by Manufacturing up-to-date • Use criteria from previous slide Atrica Confidential – NDA Required – Do Not Duplicate or Redistribute

  10. Agency Certification • Specify the list of agencies which certified the product • CE mark, TUV • UL / CSA • EMC • Safety • UL, CSA, TUV, Laser Safety, Noise • FCC • VCCI • NEBS • Outline here potential certification problems encountered for this product (if any) Atrica Confidential – NDA Required – Do Not Duplicate or Redistribute

  11. Manufacturing Readiness • Outline impact of latest changes in product design on Manufacturing • Production process ready • Hard tooling ready • Shipments • Materials (components) • Release plan ready • General Availability plan ready • Outline any changes NOT related to changes in product design made in Manufacturing area • Assembly Process • Manufacturing Tests Atrica Confidential – NDA Required – Do Not Duplicate or Redistribute

  12. Manufacturing Readiness (cont’d) • Build plans • Outline key characteristics of manufacturing ramp-up • # of builds • # of units / build • Demonstrate readiness of the supply-chain • Qualification of suppliers • Availability of materials • Demonstrate readiness of Production testing • Test station coverage and readiness. • Volume testing • Repair Policy Atrica Confidential – NDA Required – Do Not Duplicate or Redistribute

  13. Product Launch • Add here marketing readiness and product launch plans: • Objectives • Activity • Players • Budget • Time line Atrica Confidential – NDA Required – Do Not Duplicate or Redistribute

  14. Service (CSO) readiness • Specify service policy who, what, how • Service readiness • Budget • Units allocated to CSO • Training • CSO support center • Repair policy Atrica Confidential – NDA Required – Do Not Duplicate or Redistribute

  15. Product cost • Provide up-to-date product cost and GM estimates • Based on final design modifications • Using the BOM to be used in 1st production build by manufacturing • Using the latest info from contract manufacturer based on any changes made to the manufacturing process after Pilot Build • See next slide for example Atrica Confidential – NDA Required – Do Not Duplicate or Redistribute

  16. Product cost and GM FCS FCS+1Q FCS+2Q FCS+3Q List Price $0,000 $0,000 $0,000 $0,000 ASP $0,000 $0,000 $0,000 $0,000 Allowed Variance Target Target Target Target XX% GM% XX% XX% XX% XX% $X,XXX Cost BOM $X,XXX $X,XXX $X,XXX $X,XXX Y,YYY/month Order Quantity Y,YYY/month Y,YYY/month Y,YYY/month Y,YYY/month Z% Quality ARR Z% Z% Z% Z% Z% Quality DOA Z% Z% Z% Z%

  17. Decisions requested • Outline here the decisions which are requested at the end of this FDR meeting Atrica Confidential – NDA Required – Do Not Duplicate or Redistribute

  18. Back-up slides Atrica Confidential – NDA Required – Do Not Duplicate or Redistribute