IM and IM-DF connection test status. Status : Test @ FNAL (IM and DF with DF mini backplane) IM worked on DF. Low speed data transfer test was succeeded. Required data transfer speed (DDR200 MHz) was not stable due to the IM power generator problem.

carlyn
Télécharger la présentation

IM and IM-DF connection test status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IM and IM-DF connection test status • Status : • Test @ FNAL (IM and DF with DF mini backplane) • IM worked on DF. Low speed data transfer test was succeeded. • Required data transfer speed (DDR200 MHz) was not stable due to the IM power generator problem. • Test @ Waseda (IM and DF with DF mini backplane) • After replacement of power generator, required speed (DDR 200 MHz) was accomplished with channel delay. • Now we are testing the data flow around IM (i.e. QUEST->IM->DF test) with pseudo data. Test Setup @ Waseda Readout by I2C • Plan : • Test @ waseda • Finish IM data flow test in Nov. • New IMx10 (power gen replaced and minor change) available at Dec. • Final IM data flow test with new IM and new FW inDec. • Test @ CERN ( IM and DF with ATCA) • IM data flow will be tested with DF on ATCA , with pseudo data(Lab4) and read ROD data (P1) inJan and Feb. JTAG for DF DATA from QUEST JTAG for IM

  2. Some Picture Full IM mounted DF IMx4 DF in ATCA (not tested)