Portable proof loading tools take the form of an electronic handheld display, receiver cups,load cell and DTi gauge. These are highly mobile units that enable, if required, proof loading of newly installed bearings without the need to full remove the component from its assembly. To Know More Visit: http://www.carterbearings.co.uk/aerospace-bearing-tools/

Télécharger la présentation

UNASIS Portable Proof Load Kit Instruction Manual

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Aerospace Tooling Portable Proof Load Kit Instruction Manual

  2. GLOBAL MASTER DISTRIBUTOR: GLOBAL MASTER DISTRIBUTOR: Carter Manufacturing Limited Carter Manufacturing Limited TEL: +44 (0)1865 821 720 EMAIL: sales@carterbearings.co.uk TEL: +44 (0)1865 821 720 EMAIL: sales@carterbearings.co.uk 1 sales@unasisbearings.com www.unasisbearings.com Tel: +44 (0) 1235 527 770 2 sales@unasisbearings.com www.unasisbearings.com Tel: +44 (0) 1235 527 770

  3. Table of Contents Table of Figures .................................................................. 4 Part List .............................................................................. 5 Precautions Prior to Use .................................................... 6 Instructions ......................................................................... 7 Step 1 ............................................................................ 7 Connect load cell to the electronic display ............... 7 Unasis Portable Tri-Roller Swaging Tool Step 2 ............................................................................ 8 Turn on the electronic load display ........................... 8 Step 3 ............................................................................ 8 Tare the display to zero load .................................... 8 Step 4 ............................................................................ 8 Mount DTI assembly onto bearing and housing ...... 8 Step 5 ........................................................................... 10 Turn on and prepare indicator ................................. 10 Step 6 ........................................................................... 10 Apply load and begin proof load test ....................... 10 Unasis Portable Cutting Tool Step 7 ........................................................................... 10 Disassemble the proof load cell assembly .............. 10 Step 8 ........................................................................... 10 Rotate device and mount from the opposite side .... 10 Battery Maintenance .......................................................... 11 Unasis Breakaway Torque Tool 3 sales@unasisbearings.com www.unasisbearings.com Tel: +44 (0) 1235 527 770

  4. Table of Figures Figure 1 - Electronic Load Display ......................................................................................................................................... 5 Figure 2 - DTI Assembly ....................................................................................................................................................... 5 Figure 3 - Load Cell ............................................................................................................................................................... 5 Figure 4 - Battery Charging Cable ......................................................................................................................................... 5 Figure 5 - Charger Adaptors .................................................................................................................................................. 5 Figure 6 - Spanner ................................................................................................................................................................. 5 Figure 7 - Correct load cell orientation assembled ............................................................................................................... 6 Figure 8 - Correct load cell orientation exploded view .......................................................................................................... 6 Figure 9 - Load cell correctly connected to electronic load display ........................................................................................ 7 Figure 10 - Electronic load display port descriptions ............................................................................................................. 7 Figure 11 - Port of electronic load display ............................................................................................................................. 7 Figure 12 - 12 pin connector .................................................................................................................................................. 7 Figure 13 - Load cell connected to electronic load display .................................................................................................... 7 Figure 14 - Power button on electronic load display .............................................................................................................. 8 Figure 15 - Tare button on electronic load display ................................................................................................................. 8 Figure 16 - DTI assembly draw rod inserted into bearing bore .............................................................................................. 9 Figure 17 - Gap present between housing and cylinder to be eliminated .............................................................................. 9 Figure 18 - Pusher side of load cell ....................................................................................................................................... 9 Figure 19 - Receiver side of load cell .................................................................................................................................... 9 Figure 20 - Gap eliminated prior to tightening of nut ............................................................................................................. 9 Figure 21 - Gap eliminated and nut finger tightened ............................................................................................................. 9 Figure 22 - DTI gauge turned on .......................................................................................................................................... 10 Figure 23 - Torque applied to the nut to begin proof load test ............................................................................................... 10 Figure 24 - Portable proof load kit showing result of axial displacement and applied load ................................................... 10 Figure 25 - DTI assembly mounted on the opposite side of the bearing ............................................................................... 10 Figure 26 - Battery port on electronic load display and battery charger ................................................................................ 11 Figure 27 - Charger adapter box as supplied ........................................................................................................................ 11 Figure 28 - All charger adapters supplied .............................................................................................................................. 11 4 sales@unasisbearings.com www.unasisbearings.com Tel: +44 (0) 1235 527 770

  5. Part List Figure 1 - Electronic Load Display Figure 4 - Battery Charging Cable Figure 2 – DTI Assembly Figure 5 - Charger Adaptors Figure 3 - Load Cell Figure 6 - Spanner 5 sales@unasisbearings.com www.unasisbearings.com Tel: +44 (0) 1235 527 770

  6. Precautions Prior to Use  Please charge electronic load display for 24 hours prior to initial use.  Check battery life on digital display to ensure adequate life.  Make sure all contact surfaces are clean and lube dry.  Ensure the housing has suitable clearance for test to be performed. Figure 7 - Correct load cell orientation assembled  Perform an initial test by hand to ensure there is no notable free play with respect to the housing. NOTE: IF NOTABLE FREE PLAY IS PRESENT THEN BEARING HAS ALREADY FAILED. THE ASSEMBLY SHOULD BE REJECTED AND THE BEARING REINSTALLED. Figure 8 - Correct load cell orientation exploded view WARNING: IF YOUR KIT HAS MULTIPLE ADAPTER PUSHER CUPS, PLEASE ENSURE THE LOAD CELL IS REPLACED ENSURING THE RAISED BORE SIDE OF THE LOAD CELL IS IN CONTACT WITH THE NUT (EXAMPLE ORIENTATION SHOWN IN FIGURE 7 & FIGURE 8). 6 sales@unasisbearings.com www.unasisbearings.com Tel: +44 (0) 1235 527 770

  7. Instructions Step 1 – Connect load cell to the electronic display NOTE: LOAD CELL MUST BE CONNECTED BEFORE UNIT IS POWERED ON  Unscrew port cap for Sensor/Load cell connector.  Connect the load cell to the electronic load display ensuring to match the keyway with the slot.  Secure the connector by turning the collar clockwise. Figure 9 - Load cell correctly connected to electronic load display Sensor/Load Cell Output Connector USB Power Connector Connector Figure 10 - Electronic load display port descriptions Figure 11 (Left) - Port of electronic load display Figure 12 (Right) - 12-pin connector Figure 13 - Load cell connected to electronic load display 7 sales@unasisbearings.com www.unasisbearings.com Tel: +44 (0) 1235 527 770

  8. Step 2 – Turn on the electronic load display  Turn on the display by holding the power button.  The display will recognise the load cell serial number and will calibrate automatically.  The initial load may show positive or negative figures at this point. Step 3 – Tare the display to zero load Figure 14 - Power button on electronic load display  Once powered on, use the Tare/Gross button to zero out the unit before connecting the load cell to the DTI assembly. NOTE: LOAD CELL WILL NOT REMAIN AT ZERO DUE TO HIGH SENSITIVITY Step 4 – Mount DTI assembly onto bearing and housing  Mount the DTI assembly so that the draw rod goes through the bearing bore.  Please note the load cell assembly features two sides: a) Pusher side (See Figure 18)  This will contact the v-groove of the bearing. b) Receiver side (See Figure 19)  This will contact the nut. Figure 15 - Tare button on electronic load display 8 sales@unasisbearings.com www.unasisbearings.com Tel: +44 (0) 1235 527 770

  9.  Install the load cell assembly with the pusher side facing towards the bearing. Figure 16 (Left) - DTI assembly draw rod inserted into bearing bore  Hold the cylinder assembly from the opposite side.  Ensure the ridge of the pusher side is completely seated within the v-groove of the bearing.  If there is an adaptor sleeve, this should sit between the draw rod and the load cell bore.  Mount the nut onto the draw rod while holding the load cell in place Figure 17 (Right) - Gap present between housing and cylinder to be eliminated  Push the cylinder flush with the housing as you tighten the nut up to the load cell.  Finger tighten the nut. Allow all of the components to self-align, loosen the nut and then finger tighten the nut again. NOTE: OVER-TIGHTENING THE NUT AT THIS POINT WOULD APPLY PREMATURE PRESSURE ONTO THE LOAD CELL. Figure 18 - Pusher side of load cell Figure 20 (Left) - Gap eliminated prior to tightening of nut Figure 21 (Right) - Gap eliminated and nut finger tightened Figure 19 - Receiver side of load cell 9 sales@unasisbearings.com www.unasisbearings.com Tel: +44 (0) 1235 527 770

  10. Step 5 – Turn on and prepare indicator Figure 22 (Left) - DTI gauge turned on  Turn on indicator with the button on the bottom right.  Ensure the units of measurement are set as desired. NOTE: CONSULT DTI MANNUAL FOR INSTRUCTIONS ON CHANGING THE UNITS AND NAVIGATING THE DTI GAUGE. Step 6 – Apply load and begin proof load test Figure 23 (Right) - Torque applied to the nut to begin proof load test NOTE: TARE ELECTRONIC LOAD DISPLAY BEFORE APPLYING TORQUE ON THE NUT.  Apply initial load by turning the nut clockwise using the wrench.  Monitor the electronic load display to ensure only the desired load is applied to the system.  Once the desired load is achieved, take note of the linear displacement presented on the DTI gauge. NOTE: THE LINEAR DISPLACEMENT OF THE BEARING UNDER THE REQUIRED LOAD DETERMINES WHETHER THE BEARING INSTALLATION WAS COMPLETED SUCESSFULLY OR NOT. Figure 24 - Portable proof load kit showing result of axial displacement and applied load Step 7 – Disassemble the proof load cell assembly  Disassemble the proof load assembly by removing the nut, load cell and cylinder assembly. Step 8 – Rotate device and mount from the opposite side.  To test the bearing from the opposite side, reassemble the system on the reverse side and follow from Step 3. NOTE: THE LINEAR DISPLACEMENT OF THE BEARING ON THE SECOND SIDE IS THE CRITICAL INFORMATION. THIS READING SHOWS THE FULL TRAVEL OF THE BEARING WITHIN THE HOUSING. ONLY PROOF LOAD TESTING IN ONE DIRECTION IS NOT SUFFICIENT. Figure 25 - DTI assembly mounted on the opposite side of the bearing 10 sales@unasisbearings.com www.unasisbearings.com Tel: +44 (0) 1235 527 770

  11. Battery Maintenance NOTE: CHARGE ELECTRONIC LOAD DISPLAY FOR 24 HOURS PRIOR TO FIRST USE AND CHECK BATTERY STRENGTH REGULARLY  In order to check Battery Level, press the Battery/Enter Button  The battery level will be displayed as bars on the screen  In order to charge the battery, connect the charger power connector. Figure 26 - Battery port on electronic load display and battery charger  The wall charger plug configuration can be easily changed by switching to suitable adaptors. Figure 27 - Charger adapter box as supplied Figure 28 - All charger adapters supplied 11 sales@unasisbearings.com www.unasisbearings.com Tel: +44 (0) 1235 527 770

  12. Notes 12 sales@unasisbearings.com www.unasisbearings.com Tel: +44 (0) 1235 527 770

  13. Notes 13 sales@unasisbearings.com www.unasisbearings.com Tel: +44 (0) 1235 527 770

  14. Notes 14 sales@unasisbearings.com www.unasisbearings.com Tel: +44 (0) 1235 527 770

  15. This catalogue has been produced with a great amount of care and attention; all data has been checked for its accuracy. However, no liability can be assumed for any incorrect or incomplete data. Due to the constant development and expansion of the product range, we reserve the right to make modifications without prior notice. All rights reserved. Reproduction in whole or in part without authorisation is prohibited. 15 sales@unasisbearings.com www.unasisbearings.com Tel: +44 (0) 1235 527 770