1 / 46

FST Future Solutions Team

FST Future Solutions Team. Rishant Dwivedi Colin Boesch Zack Audy. Agenda. Design Proposal Prototype Testing/Refining Final Product Summary Conclusion. Problem Statement & Statement of Purpose Group Development Research Specifying Criteria Exploring Possibilities

casper
Télécharger la présentation

FST Future Solutions Team

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FSTFuture Solutions Team Rishant Dwivedi Colin Boesch Zack Audy

  2. Agenda • Design Proposal • Prototype • Testing/Refining • Final Product • Summary • Conclusion • Problem Statement & Statement of Purpose • Group Development • Research • Specifying Criteria • Exploring Possibilities • Selecting an Approach

  3. Problem Statement & Statement of Purpose According to a survey conducted at Bartlett High School, 40% of students asked have problems with their or their neighbor’s external portion of the school locker. In recent years, lockers in Bartlett High School have shown evidence that a large portion of them suffer from this problem. Statement of Purpose: Eliminate locker doors swinging in front of neighboring lockers at Bartlett High School.

  4. Group Development • Group Responsibilities • Team Name Selection • Potential Problems • Choosing the Problem

  5. Group Responsibilities • Colin Boesch • Co-leader • Builder • Rishant Dwivedi • Co-leader • Scribe • Zack Audy • Co-leader • Time keeper

  6. Team Name Selection • Innovative Engineering Experts (IEE) • Accelerated Engineering Design Group (AEDG) • Future Solutions Team (FST) • Advanced Academy Association (AAA) • Automated Solution Development Association (ASDA) Name Chosen: Future Solutions Team (FST)

  7. Potential Problems • Potential Products Considered: • Windshield Wipers • Reach entire window surface • Cleats • Do not allow mud to gather between studs • Lockers • Neighboring locker door swings in front of other locker • Stop signs • Hard to see in the night or during foggy weather

  8. Choosing the Problem

  9. Research • Patents Researched • Artifacts Supporting Problem • Companies in Locker Industry • Knowledge of Marketplace • Conducting Market Research • Team Gantt Chart • Survey Results

  10. Patents Researched http://www.google.com/patents?id=vLcdAAAAEBAJ http://www.google.com/patents?id=QDQcAAAAEBAJ http://www.google.com/patents?id=29mBAAAAEBAJ

  11. Artifacts • Cisco-Eagle.com • SchoolLockers.com • DoItYourself.com • Ehow.com • Discover Design • MkLockerServices.com • StorwellSystems.com

  12. Companies • American locker • Republic Storage (Supply BHS) • Precision Locker • DeBourgh • Lightning Lockers • Locker Solutions • Jorgenson Company • School Lockers

  13. Knowledge of the Marketplace • The Market • Schools in America (Elementary to High School) • Justification • Metals, hinges, tracks • Machinery • Priced from 79.99 to 129.99 • Existing Similar Products • Storage Lockers • Locking mechanisms • Evaluating the Competition • Locker suppliers • Identifying Users and Buyers • Users: Students • Buyers: School Administration & Officials

  14. Existing Similar Products • Problems • Swing in front of neighboring locker • Do not completely close • Become jammed upon opening

  15. Conducting Market Research • Methods for Market Research • Personal Observation • Informational Interviews • Surveys • Focus Groups • Procedure created in: • Market Research Plan

  16. Team gannt Chart (Planned)

  17. Team gannt Chart (Actual)

  18. Survey Results

  19. Specifying Criteria • Materials • Size and Weight • Ergonomics • Service life • Global environment • Aesthetics • Customer needs • Performance • Durability and maintenance • Target cost • Safety and legal issues • Product life • Operating environment

  20. Exploring Possibilities • Locker Names • Product Concepts • Colin D1 • Colin D2 • Rishant D3 • Rishant D4 • Zack D5 • Zack D6 • Rishant D7

  21. Locker Names • Top 5 Names • Alpha-Lock • Securi-Lock • Ez-Lock • Safe Lock • Speedy Lock • Product Name: Alpha-Lock

  22. Colin’s Product Concepts COLIN D1 COLIN D2

  23. Rishant’s Product Concepts RISHANT D4 RISHANT D7 RISHANT D3

  24. Zack’s Product Concepts ZACK D5 ZACK D6

  25. Select an Approach • Decision Matrix • Product Concept Presentation Poster • Presentation Survey Results • Final Design Sketch

  26. Decision Matrix

  27. Product Concept Presentation Poster

  28. Presentation Survey Results • Experience Locker Issues? • Frustrated by Issues? • Experience Swinging Door Issue?

  29. Final Design Sketch LOCKER BODY SLIDING MECHANISM

  30. Design Proposal • Build Process • Bill of Materials • Prototype CAD Drawings • Locker Body • Sliding Mechanism • Locker Door Components

  31. Build Process • Buy Materials • Attachment Process • Locker Base • Sliding Mechanism • The Organizational Aspects • Assembly

  32. Bill of Materials (WOOD Prototype)

  33. Bill OF Materials (Metal Prototype)

  34. Locker Body CAD Drawing

  35. Sliding Mechanism CAD Prototype SLIDING MECHANISM SLIDING MECHANISM WHEEL

  36. Locker Door Components CAD Drawings LOCKER DOOR E-FRAME LOCK

  37. Prototype PROTOTYPE 1 PROTOTYPE 2

  38. Testing • Tests • Testing Results • Refining the Design

  39. Tests • Pulling Door Out of Slot Test • Shoving Door Into Slot Test • Opening Door Test • Closing Door Test • Bending Locker Test • Ribbing Locker Test • Water Test on Locker • Paint Test on Locker • Sharpie Test on Locker • Strength Test on Locker

  40. Testing Results PASS FAIL • Shoving Door Into Slot Test • Pulling Door Out of Slot Test • Opening Door Test • Closing Door Test • Bending Locker Test • Ribbing Locker Test • Water Test on Locker • Paint Test on Locker • Sharpie Test on Locker • Strength Test on Locker

  41. Refining the Design • Locker Door Strengthened • Slots to be cut • Paint Covering • Reinforcement

  42. Final Product Specifications • Final Material: • Final Cost: • Final Product Features: • Sliding Door • Subject Organizer • Top Shelve • Black Box • Bottom Shelve • E-Frame Lock

  43. Summary

  44. Conclusion • Team Name: Future Solutions Team • Eliminate locker doors swinging in front of neighboring lockers at Bartlett High School • Existing Products do not solve problems • Colin D1 chosen to be Final Product Design • Prototypes made from cello foam and wood • All tests passed • Refinements considered • Final Product

  45. References

  46. ThankYou

More Related