1 / 4

Hydro Power Project Management

The water released from the reservoir flows down through the penstock. The penstock in the hydropower plant directs the water to turn the turbine. The generator is powered by the turbine, which is moved by the water wheel. Electricity is generated when the generator functions well. The quantity and rate of water flow determine the quantity of electricity generated. It also depends on the appropriate application & functioning of different hydropower solutions. https://www.techmagonline.org/2023/02/21/excelling-in-hydro-power-project-management-professional-tips-and-advice/.

cbbonline
Télécharger la présentation

Hydro Power Project Management

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Hydro Power Project Management

  2. Business Name - Canadian Babbitt Bearings Ltd. Business Opening/Starting Date - 1981 Address 1 - 64 Dalkeith Drive City - Brantford State - Ontario Zip - N3P 1N6 Phone - 519.752.5471 Country - Canada Website URL - https://cbb.ca/ Email - sales@cbb.ca Mobile Number - 519-752-5471

More Related