1 / 1

A Typical Development of a New Chemical Process

A Typical Development of a New Chemical Process. - The R&D Group works out a way to make a new Chemical. Basic Financial, cost, and operations parameters are defined . - Process Engineers develop the process and validate it in the lab and/or pilot plant

cecile
Télécharger la présentation

A Typical Development of a New Chemical Process

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. A Typical Development of a New Chemical Process - The R&D Group works out a way to make a new Chemical. Basic Financial, cost, and operations parameters are defined. - Process Engineers develop the process and validate it in the lab and/or pilot plant To do so, they had to assess very many process design combinations through block flow diagrams - The decision is taken to proceed with this process. Cost and investment projections are refined. - The Process Engineering Team makes all the basic calculations, process calculations, etc. and produce a series of PFD´s. Start-up, operations, contingency considerations may lead to changes in the PFDs. Specialists help in key knowledge and practice areas - heat and mass transfer, reactor design, etc. - As time comes to prepare the P&Ids needed for the plant, outside contractors and resources are hired to help. CAD facilities allow 3-D views of the plant ahead of its construction to ensure all spaces, operations, and contingencies are evaluated - and to avoid problems and conflicts during construction. This may take 2 to 6 months. - Meanwhile, location, financing, marketing projections have to be and firmed-up. Once the outlook is consistent with a profitable operation … the project moves to the procurement and construction phase.

More Related