320 likes | 442 Vues
This paper presents a novel bipartitioning algorithm that addresses the performance-driven bipartition problem, focusing on minimizing cutsize while managing delay. Traditional methods have often neglected the tradeoff between these parameters, resulting in suboptimal performance in designs. Our approach seeks to achieve a smooth balance between cutsize and path delay, introducing the concept of "locally unidirectional" partitions. We provide experimental results from industry-standard test cases, demonstrating significant improvements in delay reduction with controlled increases in cutsize, providing a path forward for enhanced partitioning in performance-sensitive applications.
E N D
Local Unidirectional Bias for Smooth Cutsize-delay Tradeoff in Performance-driven Partitioning Andrew B. Kahng and Xu Xu UCSD CSE and ECE Depts. Work supported in part by MARCO GSRC
Outline Motivation • Performance driven bipartition problem • New bipartitioning algorithm • Experimental results • Conclusion and future work
Partitioning and Performance The goal of traditional hypergraph partitioning is to minimize cutsize. To meet the performance requirement of current designs, we need a performance-driven partitioner, which considers both cutsize and delay.
Previous Work (I) • [Cong et al. ISPD-2002] • Global clustering based algorithm with retiming Min-delay Clustering w/ retiming Min-cutsize Clustering De-clustering and refinement • Reduces delay by 16% while increasing cutsize by 17% • Requires substantial gate replication
Previous Work (II) • [Ababei et al. ICCAD-2002] • Reweighting based method Path based Input Reweighting Cutsize oriented partitioner, such as hMetis,MLPart 1 1 Global timing analysis Find critical paths 1 Net based 1 2 1 • 14% reduction of delay with 10% increase in cutsize • 139% increase in runtime compared with hMetis
Motivating Questions Can we avoid global timing analysis? • Global timing analysis is extremely time-consuming • Can we improve path delay without significant degrading of cutsize? • Need smooth tradeoff between delay and cutsize • Can we reduce implementation overheads? • Previous methods store thousands of critical paths and continuously update them
Outline • Motivation Performance driven bipartition problem • New bipartitioning algorithm • Experimental results • Conclusion and future work
Delay Model Delay = hop_delay + node_delay hop Part 1 Part 0 FF nodes Combinational nodes cut [Cong et al. ISPD-2002] hop_delay=5 node_delay=1 Delay = 3x5 + 5x1 = 20 [Ababei et al. ICCAD-2002] hop_delay=Elmore delay node_delay=constant
Performance Driven Bipartition Problem • Given: • Hypergraph H=(V,E) • Area Balance tolerance s (0<s<1), a parameter to control allowable slack in the area constraint • a, a given parameter which captures tradeoff between cutsize and path delay (hopcount) • Find: • A bipartition (V0|V1) which satisfies: • and minimizes a(cutsize)+(1-a)(Max_hopcount)
Outline • Motivation • Performance driven bipartition problem New bipartitioning algorithm • Experimental results • Conclusion and future work
Unidirectional Partition Path delay is minimized with hopcount = 1 if the partition is unidirectional (“acyclic”), that is, all cuts are in the same direction Part 1 Part 0 Part 0 Problem: • High cutsize • No unidirectional solution Can we achieve “locally unidirectional” partition? Max hopcount=5 Max hopcount=3 Part 0 Part 0 Part 1 Part 1
V-Shaped Nodes V-shaped node If a combinational node vsatisfies: there exist vj, vt in the other part and a path from vj to vt that includes only v thenv is a V-shaped node vj vt Part 0 Part 1 v
V-Shaped Nodes in Critical Paths Empirical observations from study of partitioning solutions: • there are V-shaped nodes in the partitioning solutions • every V-shaped node is included in many critical paths • every critical path contains several V-shaped nodes For testcase 1: • Number of nets : 16377 • Number of critical paths : 26772 • On average, one critical path contains 27.6 nodes • On average, one critical path contains 3.4 V-nodes • On average, one V-node belongs to 233.7critical paths
Key Idea: V-Shaped Nodes Elimination Part 0 f Part 0 f c a c a Move b b Part 1 b d e d e Part 1 Move V-shaped node “b” to reduce path hopcount PATH: abc hopcount=0 PATH: dbc hopcount=1 PATH: ebc hopcount=1 PATH: abc hopcount=2 PATH: dbc hopcount=1 PATH: ebc hopcount=1
Distance-k V-Shaped Nodes Elimination Distance-k V-shaped Nodes (Vk Nodes): Paths of k combinational nodes with neighbors in the other part. Part 0 Part 0 d a d a b c Move b,c Part 1 b c Part 1 k = 2: Move V2 node “b, c” reduce path hopcount from 2 to 0 Problems with large k: Cutsize may be greatly increased
New Gain Function v v After Move Before Move Gain(v)=δ(0)+ δ(1) g(v): traditional FM gain rj(v): reduction of Vj nodes after moving v
Distance-k Unidirectional Algorithm Calculate initial gains for all nodes and store the gains Select the node v with maximum gain /* CLIP-like method: move the cluster that v belongs to */ Reset the gains of all nodes to zero Move v and update the gains of v and its neighbors While ( one node not moved) Select one node v with the maximum updated gain Move v and update the related gains Find the point in the move sequence at which the sum of gains is maximum; undo all moves after this point
Outline • Motivation • New bipartitioning algorithm • Experimental results • Conclusion and future work
Experimental Setup • Four industry testcases obtained as LEF/DEF • Model of Ababei et al. (ICCAD-2002) used to calculate delay • Partitioning solutions compared to results of MLPart • strongest multilevel netlist partitioning code • website: http://nexus6.cs.ucla.edu/GSRC/bookshelf/Slots/Partitioning/MLPart • All tests on 600MHz Intel Pentium-III Xeon
Biasing against V1 Nodes vs. MLPart δ(0)=1, δ(1)=10 • Reduction of delay: 4.5%-24.4%average:15.1% • Increase of cutsize:3.0%-10.0%average:4.9% • Increase of runtime:6.3%-11.4%average: 9.7% Using the delay model in Cong et al. ISPD -2002 • Reduction of delay: 4.3%-21.2%average:14.7%
Biasing against V2 Nodes vs. MLPart δ(0)=1, δ(1)=30, δ(2)=3 • Reduction of delay: 8.9%-30.0%average: 18.7% • Increase of cutsize:3.1%-7.2%average: 3.5% • Increase of runtime:11.9%-15.9%average: 13.1% Using the delay model in Cong et al. ISPD -2002 • Reduction of delay: 8.3%-28.7%average: 17.3%
Outline • Motivation • Performance driven bipartition problem • New bipartitioning algorithm • Experimental results Conclusions and future work
Conclusions • Simple yet efficient timing-driven partitioning that does not require global timing analysis • Negligible implementation, runtime overhead • Significantly reduces path delay with cutsize and runtime almost same as leading-edge MLPart • Similar improvements observed with different path delay metrics • Futures • Impact of new partitioner on placement • Efficient methods for biasing δ(k) k>2
Future Work • Impact of new partitioner on placement • Efficient methods for biasing δ(k) k>2
Why Performance Driven Partitioning? • Achieving timing closure becomes increasingly difficult in deep-submicron technologies due to non-ideal scaling of interconnect delay • Routing alone can no longer solve timing problem, even with aggressive optimizations (buffer insertion, buffer/wire sizing,…) Timing needs to be addressed at all design stages • Partitioning is a critical step in defining interconnect timing properties, but is traditionally driven by cutsize objective
Previous Work (I) • With Logic Replication • Retiming • Replication graph • Without Logic Replication • Net based reweighting • Path based reweighting
Part 0 Part 1 FM Partitioning and Gain Function Start with random partition v v Move the node with the max gain and lock it Part 0 After Move Before Move Part 1 Gain(v)=-1 Gain(v) = Reduction of cutsize after moving v Keep moving until all nodes are locked Find the best point in the move sequence Part 1 Part 0 Part 0 Part 1
Procedure to Calculate rj(v) Delete all FF nodes and their related edges In the remaining graph, BFS from v Foreach level j from 1 to k If v is a Vj node before moving, rj’=1 If v is a Vj node after moving, rj’’=1 rj=rj’’-rj’
v CLIP v CLIP Algorithm Reminiscent of CLIP (Deng et al. DAC 1996) in how it induces movement of clusters across the cutline.
Distance-k V-Shaped Nodes Distance-k V-shaped nodes (Vk-node): If k combinational nodes vi,1 … vi,k satisfy: vi,1 … vi,k are in the same part vj, vt in the other part a path from vj to vt and only passes vi,1 … vi,k thenvi,1 … vi,k are distance-k V-shaped nodes vj vt Part 0 Part 1 vi,1 vi,k
Notation • H(V,E)= circuit hypergraph • V = set of nodes representing components of the circuit • E = set of signal nets • A bipartition (V0|V1) of H(V,E) divides V into two disjoint subsets s.t. V= V0V1, which are called Part 0 and Part 1 • A= the total area of all the nodes in V • A0= the area of all the nodes in V0