An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Uttarakhand Sabhi ke liye shiksha parishad State Project Office Shiksha Sankul, Mayur Vihar, Sahstradhara Road, Dehradun

  2. ZoneIV Tehri Dehradun Haridwar Nainital Champawat U.Singh Nagar Pauri Almora Zone V Chamoli Rudraprayag Bageshwar Pithoragarh Uttarkashi Pauri Almora SEISMIC ZONE

  3. Seismic Zone India and Uttarakhand .

  4. Number of major Civil Works

  5. Training & Designs • School designs were prepared by C.B.R.I Roorkee.as per availability of land and sites. • C.B.R.I took measures for earth quake resistance designs. • Training regarding construction work was /is being imparted to… • 1-Three days training to D.P.Os at CBRI campus with illustrative demo. in labs & lab areas. • 2-Five days training to A.Es & J.Es by experts from G.B.Pant University of Agriculture & Technology Pantnagar. • 3-One day training to the concerned VEC members. • 4-On side support to the masons.

  6. Implementing Agency &Supervisory Staff. • All type of construction works are undertaken by VEC. • For technical support, one Junior Engineer is deputed at each block and one Assistant Engineer for district.At state level a team of engineers comprising one Executive Engineer with two Junior Engineers are to monitor civil works. • Besides this, a civil work co-ordinator is appointed at state level for better co-ordination among the stake- holders.

  7. Third Party Evaluation of Civil Works • G.O.I guidelines • To maintain quality of civil works. • To assure the standard quality of construction material and to obtain independent assessment of the technical quality of civil works. • To motivate and train VECs. • To highlight the problem area and to suggest step/solutions to achieve overall quality assurance. • Periodical supervision of physical progress for completion of works in schedule time frame.

  8. Engaging C.B.R.I. for TPE • For this job MoU was singed with C.B.R.I because of… • 1- National wide reputed institution. • 2- Easy to access. • 3- World class laboratory. • 4- Expertise in the field of technical evaluation and quality assurance of building construction. • 5- Vested with the responsibility of generating, cultivating and promoting building science and technology in the service of the country. 6- Finding timely, appropriate and economical solutions to the problem of materials, efficiency, structural and foundation problems and disaster mitigation.

  9. Budgetary Provision • Total No. of 2119 Civil Works to be evaluated. • Total amount to be paid to CBRI Rs. 93.50 lacs. • Amount is released to CBRI on installment basis:- 1-Rupees Twenty Five lakhs + Service Tax. along with acceptance of this MoU. 2-Rupees Twenty Five lakhs + Service Tax after six month and submission of first interim report of schools inspected during the last six months 3-Rupees Twenty Five lakhs + Service Tax. after twelve months and submission of second interim report. 4-Rupees Eighteen lakhs & Fifty Thousands + Service Tax. after eighteen months and submission of final report. The final report will contain all inspections and interim reports.