Heat stress to IP chamber

Heat stress to IP chamber. 11 November 2002 Toru Tsuboyama (KEK). Cracks in the IP Berryllium chamber ( discovered on 8 November ). Crac ks like structure were found here. Beryllium and aluminum parts are welded. 200 m m thick gold plate (where dark spots were found).

Télécharger la présentation

Heat stress to IP chamber

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Heat stress to IP chamber 11 November 2002 Toru Tsuboyama (KEK)

  2. Cracks in the IP Berryllium chamber (discovered on 8 November) • Cracks like structure were found here. • Beryllium and aluminum parts are welded. • 200 mm thick gold plate (where dark spots were found)

  3. The temperature history of the IP chamber • The temperature of the inner beryllium part can not be measured. We only know • T0, the temperatures of the aluminum part cooled by water. • T1, the outer cylinder of the beryllium part cooled by Helium gas. • The heat and mechanical stress simulation tells T1-T0 should be kept less than 5 degrees. • 5 November 2000, fill pattern study. • A 2.5 bunch spacing hit the resonance of he IP chamber. • Two accidents in the helium circulation system. • September 30 6:10 • October 16 12:50 T1 T0

  4. 2000 autumn – 2002 autumn • Due to large amount of data, ~10 minutes average values are plotted and peaks in data are smeared out in this page • Beam current • LER+HER(black) • LER(red) • HER(blue) • Beam current was gradually increased according to the length of solenoid coils around the vacuum chambers. • T1-T0 vs LER+HER • 2000 fall- blue • 2001 fall – red • 2002 fall -- black T1 T0 T1-T0

  5. January-June 2002 • In spring, KEKB run in pure 4 bucket spacing since luminosity in semi 4-bucket spacing mode was lower than pure 4-bucket spacing mode. • T1-T0>2.0oC when LER+HER>1.9A.

  6. 2002 September-October • Increase of current. • High current runs are done in semi 4-bucket fill pattern. • Semi 4-bucket spacing fill pattern yielded lower heat to IP. • T1-T0~2.5oC when a run starts LER+HER=2.5A.

  7. 5 November 2000: Bunch pattern study • 2.5-bunch spacing caused high temperature. • T1-T0 was about 5oC at LER =600mA. • MAFIA code showed a resonance frequency of ~1/5 of the acceleration RF(508MHz). • Even the aluminum part was heated. (T0) • No detail data is left. T1 T0 T1-T0

  8. 30 Septemebr, 6:10. Circulation system stopped. • Beam current ~1.9A • Beam abort request • The hardware abort from the circulation system. • 30 seconds after the system stops. • Temperature interlock did not fire • Condition: One of the temperature sensors shows 3 degree higher temperature than that in the usual operation. T1 T0 T1-T0

  9. Close up • Horizontal axis shows minutes. • Max (T1-T0) ~5.5 oC • (T1-T0) < 0 oC region at minute > 10 is due to the absence of the helium flow. T1 T0 T1-T0

  10. 16 October 12:50 The second accident • Beam current~1.5A • Beam abort • Abort from the circulation system • No temperature increase. • No temperature beam abort. • After the first accident I asked the company to shorten the delay of the circulation hardware abort. (I should confirm the modification) T1 T0 T1-T0

  11. 30 October LER high current study • No particular increase of the temperature. T1 T0 T1-T0

  12. 30 October 2:30 AM. Vacuum leak • No particular increase of the temperatures T1 T0 T1-T0

  13. 1 November: Scrubbing • No particular temperature increase was found T1 T0 T1-T0

  14. 6 November: Scrubbing • NO particular temperature increase was found T1 T0 T1-T0

  15. Fill number (Spring-summer 2002) • Total 2200 fills • In most fills T1-T0 >~ 2.0oC • Among them, in about 500 fills, T1-T0 >~ 2.5oC

  16. Fill number (2002 fall) • Since –60 days from today, T1-T0 is more than 2.5oC. Corresponding fills are 10400-9600=800 runs.