An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Production/ Operations MANAGEMENT Presentation on WINDSOR CHAIR

  2. Presented to: Prof. Muhammad alipresented by: Waqas mushtaqmbA 4c 11515 Imran ahmad 11558 tanzeel shahid 11548 asif rasheed 11538 shoaib ilyas 11512 farah arshad 11551

  3. Product:Windsor chair

  4. Introduction Windsor chair Traditional dining chairs are most often formal dining chairs made from wood with a medium or dark finish. When upholstered, they usually feature leather or white/off-white fabric.

  5. Production process Purchase of Raw Material Cutting Shaping Assembling Polishing Finish Good

  6. Material used for production • Wood • Nail • Glue • Dana lakh • Sundress • Spirit mentholated • Thinner • Cloth/Leather/ • Foam • Colors

  7. Capacity Analysis • A Normal worker complete one chair in two days. • In our manufacturing plant 10 workers will work 8 hour daily. • So five chairs will manufactured daily. • Following machines will be used? Edge Bending Double Headed Single Headed

  8. Design Capacity • Workers Daily output Days in month Monthly capacity 10 * 0.5 * 30 = 150 • Our monthly designed capacity will 150 so our yearly designed capacity will be = 1800

  9. Effective Capacity • Designed Capacity =150 • Less Holiday 4/week =20 • Labor strike+ Load shedding/month+ other event holiday =20 Total Effective Capacity =110

  10. Actual Capacity Our actual capacity will be depend upon customer demand, and customer orders, we will make chairs according to the requirement of the customers. Because chair is not for consumption as like food items, so we can increase or decrease our capacity as per order requirement.

  11. Location analysis • Our manufacturing plant will be located at Mandi Bahauldin road Gujrat near Shaheenchowk . • It is in the center of Lahore, Rawalpindi,& Sargodha. • Labor cost is low. • Growth chances high. • Easy available of raw material. • Land cost is very Low

  12. Product Design • Product is very simple for manufacturing concern. • It is not have complex features. • Changed designed through compute aided design (CAD).

  13. Product costing

  14. Quality Control Method • Better quality wood • Machines will repaired every weekend. • Supervise personally. • We will motivate the employees on quality and we will gives rewards.