1 / 15

WP 13 Thematic Assemby Center for SST

WP 13 Thematic Assemby Center for SST. Reminder - Partnership. WP 13 SST TAC Management & coordination ( M-F ). Development Maintenance. R&D. Production. CalVal. M-F MetO NOCS IFR CNR Met.no DMI. M-F MetO NOCS IFR CNR Met.no DMI. M-F MetO NOCS IFR CNR Met.no

chenoa
Télécharger la présentation

WP 13 Thematic Assemby Center for SST

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WP 13Thematic Assemby Center for SST

  2. Reminder - Partnership WP 13 SST TAC Management & coordination (M-F) Development Maintenance R&D Production CalVal M-F MetO NOCS IFR CNR Met.no DMI M-F MetO NOCS IFR CNR Met.no DMI M-F MetO NOCS IFR CNR Met.no DMI M-F MetO NOCS IFR CNR Met.no DMI

  3. Reminder - Objectives forR&D • Main objectives of R&D activities over 3 years : • Improvement of inter-sensor bias correction schemes • Improvement of error co-variances used in SST analysis schemes • Improvement of SST climatologies • SST analysis in Arctic Ocean Marginal Ice Zone • Necessary R&D activities for SST TAC new products (OSTIA re-analysis, higher resolution regional SST analyses) • Main issues : • Little resources dedicated to R&D (low ratio imposed during the proposal preparation) • MyOcean R&D call : no possibility for funding R&D activities outside the MyOcean Consortium

  4. R&D : main achievements • Main achievements for the 2nd year : • OSTIA re-analysis : final tuning of the OSTIA re-analysis chain before extensive re-processing : improved sea ice masking of PATHFINDER AVHRR data, improved smoothness in time, bias correction of ATSR-1 data against in-situ observations (MetO) • HR and UHR SST analyses in Med Sea : development of an improved bias correction and data merging scheme, and validation of the new scheme over year 2008 (CNR) • Main difficulty : • DMI/M-F proposal on inter-sensor bias correction to the first MyOcean R&D call finally not endorsed by SAC • Remaining activities/objectives • Improvement of SST climatologies : will be derived from OSTIA re-analysis (MetO)

  5. Reminder - Objectives forDev. & Maintenance • Main objectives over 3 years : • From V0 to V1, main objectives are : • Operational consolidation of processing systems in place • Interfacing with MyOcean system (Service Desk, MIS etc…) • Implementation of KPIs for SST TAC production • Definition and implementation of NRT quality control and validation tools for SST TAC • Implementation of the OSTIA re-analysis chain • From V1 to V2, products upgrades (higher resolution SST analyses over Baltic Sea and Arctic Ocean) • Main issue : • too short time between the availability of specifications for V1 (T0 + 5) and the V1 operational qualification (T0 + 18)

  6. Dev. & Maint. : main achievements • Main achievements for the 2nd year : • Implementation, configuration and testing of the THREDDS server and MIS gateway in SST TAC Dissemination Units (IFR, CNR and MetO) • Consolidation of operational production line for Arctic SST analysis (Met.no) • Development of new operational production line for global ODYSSEA SST analysis (IFR) • Main difficulties : • Lack of progress of HR-DDS (NOCS) • Lack of information for THREDDS server configuration and MIS gateway installation • Very tight schedule for V1 integration and testing • Remaining tasks : • Upgrades for V2 (including evolution towards GDS V2)

  7. Reminder - Objectives forProduction • Production architecture : • SST TAC production distributed over 6 Production Units • A 7th unit running a central quality monitoring and validation tool (HR-DDS at NOCS) • SST TAC products from 4 Production Units disseminated by IFR • 2 other Dissemination Units : MetO (OSTIA, GMPE), CNR (Med Sea and Black Sea products) • Almost all production lines already in place (but at various operational levels), key issue for V1 is their integration into the MyOcean system • Main issue : • Not enough resources for extensive reprocessing of all SST TAC products

  8. Production : main achievements • Main achievements for the 2nd year : • All committed SST TAC near real-time products produced and made available operationally for V1 Stream 1(except global ODYSSEA SST analysis) • All SST TAC Dissemination Units interfaced with the MyOcean system • Global OSTIA SST re-analysis (1985 – 2007) produced and made available (MetO) • Main difficulties : • Start of global ODYSSEA SST analysis operational production delayed (IFR) • Remaining objectives : • Operational production of remaining committed products for V1 (global ODYSSEA SST analysis) • Improvement of incident/problem management in SST TAC

  9. Reminder - Objectives forCal / Val • Main objectives over 3 years : • Quality control of input satellite data sources (L2P) based on match-up data bases (in-situ) made available in NRT by IFR and monitored continuously by M-F • First quality control step in NRT by each production unit for its products (L3/L4) • All SST TAC NRT products fed into the HR-DDS at NOCS, which can generate alarm messages to production units • Use of GMPE for quality control and validation of global SST analyses (MetO) • Main issue : • Definition of common validation areas and metrics with the MFCs

  10. Cal/Val : main achievements • Main achievements for the 2nd year : • Collection/production of match-up data bases for most of the input L2P SST TAC products in a standardized format (IFR) • Implementation of consistent products validation and quality monitoring schemes in all SST Production Units • Main difficulties : • Lack of progress of HR-DDS (NOCS) • Remaining tasks : • Full exploitation of match-up data bases for continuous quality monitoring of input L2P SST products (M-F)

  11. MainChallenges • Scientific Challenge : • Strong interaction needed to understand and define which is the “best” satellite SST product for data assimilation in each MFC (we didn’t achieve this in MERSEA) • Technical Challenge : • Schedule for V1 getting more and more challenging (detailed interface specifications between production/dissemination units and central sub-systems not yet frozen) • Operational Challenges : • Strong dependence on multiple input satellite data sources (SST L2P producers) • Single point of failure : AATSR SST L2P products (currently no satellite alternative for bias correction)

  12. FutureChallenges • Scientific Challenges • None • Technical Challenges • None • Operational Challenges • Management of SST TAC transition from V1 to V2 (SST TAC products format change), and of its impact on users • Ultimate Challenges • Having and keeping people with the right expertise in the right job in the long term • Main Risks • Disappoint users

  13. Calendar • Past : • December 2010 : SST TAC near real-time products part of MyOcean V1 Stream1 • End 2010 : end of global OSTIA SST re-analysis production (1985 – 2007) • Future : • June 2011 : global ODYSSEA SST analysis part of MyOcean V1 Stream2 • End 2011 / early 2012 : SST TAC production compliant with GDS V2

  14. 1st reporting period : Budget ~ 2 mn • Figures will be provided by PMO as soon as your partners have finished reporting and will be added to your presentation. • Be ready to give short explanations on main deviances during your presentation... • We are talking about estimated budget (best estimates) !

  15. Global OSTIA SST re-analysis Nino 3.4 climate index for OSTIA (Red) and Reynolds (Blue)

More Related