This document outlines key presentations and specifications discussed during the Environmental Retrofit Conference held in New Rochelle, New York, on February 9, 2010. Highlights include presentations by Jonathan Bass, an Environmental Specialist from NYSDOT, covering vital topics such as ULSD usage, idle restrictions, receptor protection, and onsite dust control measures. It also details the NYSDOT Green Construction Practices and the diesel emission control requirements for projects over three years in duration. For further inquiries, contact Jonathan Bass at the Office of Environment, NYSDOT.

chogan
Télécharger la présentation

GCA/LICA/CIC Environmental Retrofit Conference

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GCA/LICA/CIC Environmental Retrofit Conference February 9, 2010 New Rochelle, New York Jonathan Bass, Environmental Specialist New York State Department of Transportation

  2. Route 9A Reconstruction Specifications • ULSD/Idle Restrictions/Receptor Protection 9AULSD.PDF • Onsite Dust Control Measures 9ADust.PDF • Diesel Emission Control Requirements 9ARetrofit.PDF

  3. NYSDOT Project Assessment for 9A Specification Incorporation • Project Classification (NEPA & SEQR) • Construction Duration (> 3 Years) • Diesel Exhaust Emission Estimate of Most Costly Construction Year • Particulate Matter (PM) Annual Threshold of 15 tons/year

  4. NYSDOT Green Construction Practices (EI 09-009) • Effective in Project Lettings of 9/3/09 • Applies to NYSDOT Projects Statewide • Includes Use of ULSD, Idle Restrictions, Receptor Protection and Dust Control Measures NYSConstructionSpecs.pdf

  5. Questions? Jonathan Bass Office of Environment NYSDOT (518) 485-5315 jbass@dot.state.ny.us