Renewable Energy at Closed Landfills Workshop: Landfill Post Closure Use Critical Components July 26, 2012. John Carrigan MassDEP Northeast Regional Office. Critical Application Components. What the DEP permit reviewer will be most focused on: Foundations Storm Water Controls

christmas
Télécharger la présentation

John Carrigan MassDEP Northeast Regional Office

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Renewable Energy at Closed Landfills Workshop: Landfill Post Closure Use Critical ComponentsJuly 26, 2012 John Carrigan MassDEP Northeast Regional Office

  2. Critical Application Components • What the DEP permit reviewer will be most focused on: • Foundations • Storm Water Controls • Long-Term Maintenance

  3. Foundations • Must not compromise the function and integrity of the landfill cap/final cover system: • Keep water out, • Management of storm water runoff, and • Keep landfill gas in. • Must be structurally stable and accommodate loading/settlement.

  4. Landfill Gas Control and Monitoring Plan • Address Impact of Facility Design on Landfill Gas Controls and of Landfill Gas on the Facility • Design criteria • Public Health (toxic compounds in ambient) • Safety (explosion, fire, asphyxiation) • Welfare (nuisance odors) • Landfill Gas Control and Risk Reduction Methods • Engineering • Management controls • Monitoring

  5. Geotechnical Analysis – Settlement & Stability • Demonstrate No Adverse Impact to Final Cover and Design is Structurally Stable • Site/Design Specific Geotechnical/Stability Analysis • Pre and Post Construction Monitoring

  6. Stormwater Controls • Consider: • the foundation design and density of development. • location and orientation of power lines from development. • Will these factors concentrate runoff and erosion potential or create water bars? • Design for the 24-hour, 25 year storm event. • Evaluate flooding potential from the 24-hour, 100 year storm event.

  7. Long-Term Maintenance • Maintenance ensures the continued functionality of the cap/final cover system and all of its components. • Designed well: Maintenance should be minimal. • Designed poorly: may need efforts to address instability, frequent erosion/cap repairs, and/or labor intensive vegetation control.

  8. Post Closure Monitoring & Maintenance Plan • Inspections • professional engineer or qualified professional • problems noted & scheduled for follow-up attention • Routine Monitoring and Repairs • mowing, removing brush and trees, reseeding • storm water • landfill gas collection system • leachate collection system • environmental monitoring system • Post Closure Monitoring • evaluate effectiveness of final cover system • post closure use areas

  9. IT’S NOT ROCKET SCIENCE Design Considerations • Impact of the Facility on the Landfill • Integrity and Function of the Cap, Landfill Gas and Storm Waster Controls • Impact of the Landfill on the Facility • Post-Closure Operation, Monitoring, and Maintenance of the Landfill including the Facility