LARGE EFV APPLICATIONS STUDY

LARGE EFV APPLICATIONS STUDY. Mike Israni Senior Technical Advisor Manager: National Standards July 30, 2009. NTSB RECOMMENDATION P-01-2. NTSB issued P-01-2 on June 22, 2001 PHMSA should require operators to install EFVs on all new and replacement service lines

Télécharger la présentation

LARGE EFV APPLICATIONS STUDY

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LARGE EFV APPLICATIONS STUDY Mike Israni Senior Technical Advisor Manager: National Standards July 30, 2009

  2. NTSB RECOMMENDATION P-01-2 • NTSB issued P-01-2 on June 22, 2001 • PHMSA should require operators to install EFVs on all new and replacement service lines • All customer classifications with suitable gas service conditions included

  3. PIPES ACT OF 2006 • Section 9 mandated that PHMSA require EFV installation on new and replacement single family residential service lines operating at ≥ 10 psig continuously throughout the year • PHMSA issued Advisory Bulletin ADB-08-04 • Advised gas distribution operators that EFV mandate went into effect June 1, 2008 • PHMSA issued NPRM for DIMP which proposed to: • Eliminate 49 CFR 192.383, EFV notification requirement • Require EFV for SFR Service Line (Proposed 49 CFR 192.1011 ) • Require operators to report the number of EFVs installed • Retain exceptions due to operations difficulties

  4. EFV TEAMOrganizations Represented • »Regulators • PHMSA, OPS • NTSB • States, NAPSR • » Fire Services »Public »EFV Manufacturers »Distribution Operators AGA APGA

  5. ACTION PLAN • Data collection • Incidents subject to mitigation • Additional data requirements • Review recommendation with NTSB • Assessment of technical feasibility, cost, risks, safety • Share current EFV technology, availability, and cost data • Review EFV utilization: residential, commercial, industrial • Identify modifications required for EFV performance stds • Identify the effect of EFVs on operations and safety • Changing loads, snap loads, contaminants • Service line size and pressure • Compilation of findings

  6. INCIDENT DATA1984 - Jan 2009 1557 960 870

  7. NRRIEFV SURVEY DATAMarch 2007 • Operators reported 1,108 successful gas flow terminations in response to severe line breaks • Actuations as % of installed EFVs: 0.044% • EFVs seldom close inadvertently • False closures as % of EFVs: 0.0089% • Reliability data • 2% of EFVs installed on gas lines that ruptured failed to function properly • Of the 497 respondents, 3 experienced failed closures

  8. JUNE 23rd MEETING SUMMARY • EFVs available ≤ 5,500 SCFH, pressures ≤ 1000 psig • Dynamic nature of customer load changes could require either • More frequent need to replace EFVs, or • Larger service line/EFV in anticipation of future load growth • Larger lines/EFVs installed in anticipation of future load growth could result in greater consequences or failure to close when needed • DIMP rules and damage prevention requirements should reduce incidents and need for EFVs • Data on EFV use beyond SFR is very limited • Countries outside of US do not mandate use of EFVs • Existing ASTM and MSS standards are based on ensuring operability at 125 psig inlet pressure