160 likes | 284 Vues
CORONA. Len Rice, MS22 (951) 273-5762 Leonard.rice@navy.mil. CMDTC1858. 1. CPR Process Update. Len Rice MS22 6 May 09. Calibration Problem Reports (CPRs). Types of CPRs Received Unsupported Models
E N D
CORONA Len Rice, MS22 (951) 273-5762 Leonard.rice@navy.mil CMDTC1858 1
CPR Process Update Len Rice MS22 6 May 09
Calibration Problem Reports (CPRs) • Types of CPRs Received • Unsupported Models • Result of full logistic support not established before TMDE is fielded (e.g. calibration support) • Similar to supported model: Add to ICP • Instrument Calibration Procedure Related • Calibration support established • Technical Questions/Problems with the ICP • Other • Policy related • METRL Questions/Problems
FY08 IMPROVEMENTS • NAVSEA METCAL Technical Assistance Coordinator (TAC): Gary Reid, NSWC Corona • Calibration Problems/Issues routed to the TAC • CPRs • Emails • Phone calls
CPR IMPROVEMENT PROCESS • CPR IMPROVEMENT PROCESS • Established a Technical Assistance Coordinator to review all CPR’s and separate problems into 2 categories: engineering/non-engineering • Answer all received CPR’s within 14 working days of receipt. • Answer technical problems quickly when possible • Provide an email response to submitting calibration lab • To notify that CPR has been received and review is in process • To provide answers to CPR • Technical Assistance Coordinator provides direct 2-way communication on technical problems before detailed information is lost over time. • Call back within 24 hours M-F for clarification/details on problem • Answer question or provide further direction within 72 hours M-F • CPRs still needed for problems requiring engineering support or for answer to be posted on website
TAC CPR PROCESS • CPR PROCESS: • When a NAVSEA calibration activity submits a CPR to NSWC Corona it will be assigned to the TAC (excluding unsupported model CPRs). • Unsupported model CPRs will be assigned to the NSWC Corona, Seal Beach Det first for TMDE Technical Agent response. • If the TAC can answer the CPR, the following possibilities exist: • Disagrees with the CPR • Email findings to submitting lab with amplifying remarks • Close CPR • Agrees with the CPR • Add item to METRL • Change METRL entry • Add to an ICP • Lab to develop Local Calibration Guidance (LCG) • Lab to develop and submit an Local Calibration Procedure (LCP) • After action is initiated: • Email submitting calibration lab with findings, and • Close CPR
TAC CPR PROCESS • If the TAC can not answer the CPR, forward the CPR to: • Corona Metrology Engineering for engineering investigation and resolution • Management for policy questions • The TAC will send an email to the submitting calibration lab with the status of the CPR when the TAC is finished with this part of the CPR process regardless of the determination of the CPR.
TAC EMAIL PROCESS • Email Technical Assistance requests • When a NAVSEA calibration lab submits a technical assistance request via email, the TAC will: • Review the request and decide if he can answer the request in a short email, or if the lab should submit a CPR. • If the TAC determines that the issue is involved enough or is important enough for all labs to be able to review, then the lab will be asked to submit a CPR.
TAC PHONE PROCESS • Phone Technical Assistance Requests • When a NAVSEA Calibration Lab phones a technical assistance request the TAC will: • Attempt to resolve the problem on the phone • Determine if the problem is too large or complicated to be handled on the phone, or that it requires an email or a CPR to be resolved • Instruct the Calibration Lab to either email the request or send in a CPR for the problem.
FY08 TAC CPR Status • All FY08 CPRs reviewed by the TAC • CPRs from previous fiscal years also reviewed (Later CPRs first) • FY08 CPRs • Received 262 • Completed 629 • In Work 90
FY09 TAC CPR Status • Continue review CPRs from previous fiscal years (Later CPRs first) • Priority on current FY CPRs • FY09 CPR Status as of 15 April 2009: • Received 428 • Completed 735 • In Work 50
Questions/Comments? NAVSEA METCAL TAC: Gary Reid gary.reid@navy.mil (619) 545-1809 CPR Process Update
BACKUP SLIDES CPR Process Update
TAC CPR PROCESS • When submitting a CPR we ABSOLUTELY NEED to have all reference documentation for the TI. (i.e.. Specs, performance test from tech manual, etc.). • All additions or changes to the METRL requires technical data to be provided with the change request. • Please scan and email all reference documentation to gary.reid@navy.mil and vicellen.mancini@navy.mil
TAC CPR PROCESS • Please ensure that the contact information (email address, phone numbers etc.) for the Calibration Lab is correct on the CPR forms prior to submitting it. • This is the email address we use to inform you that we have received and are working on the CPR. • Also, this is the email address or phone number we use if we need to contact the lab for additional information.
TAC CPR PROCESS • Do not submit CPRs or call TAC for: • Adding standards to NCE: Use CALSAL Change Request (CR) • Standards Allowancing Changes: Use CALSAL CR • Any instrument that is NCR per METRL Section 1 guidance • Any instrument that can be calibrated using general guidance in METRL Section 1 • Any instrument with model number options different from the supported model in METRL that does not impact the calibration being performed • Do not submit CPRs for Policy Issues: Call or email the TAC or NSWC Corona MS22