This document provides an overview of the January 11, 2017 meeting of the Planning Geomagnetic Disturbance Task Force (PGDTF). It includes updates on national and state activities regarding geomagnetic disturbances, legislation, and proposed task forces. Relevant topics discussed include protection of electric power transmission and distribution systems, electromagnetic threat preparedness, grid security, and more.

codyk
Télécharger la présentation

Planning Geomagnetic Disturbance Task Force (PGDTF) Meeting Material

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Planning Geomagnetic Disturbance Task Force (PGDTF) Meeting Material January 11, 2017 Michael Juricek PGDTF Chairman 1/11/2017 PGDTF Meeting

  2. National and State Activities Regarding GMD State Activities 85 (R), HB 407 Relating to Protection of Electric Power Transmission and Distribution System. • Commission Shall Identify and Implement Design Standards for T&D Systems to Limit EMF Levels and to Protect the T&D Systems. • Commission Shall Require Independent Organization to Consider EMF Levels When Determining Public Need for a Transmission Line. • Electrical Power Grid Reliability Task Force Will Be Created to Study Measures to Protect and Strengthen T&D Systems from All Hazards and to Submit a Report to the Governor and Legislature No Later Than September 1, 2018. • Act and Task Force is Abolished September 1, 2019. Michael Juricek – 1/11/2017 PGDTF Meeting

  3. National and State Activities Regarding GMD Continued 85 (R), SB 83 Relating to Protection of Energy Critical Infrastructure from Electromagnetic (EMF), Geomagnetic, Terrorist and Cyber-Attack Threats. • Electromagnetic Threat Preparedness Task Force Will Be Created to Develop a Comprehensive Recovery Plan No Later Than September 1, 2018. • Independent Organization (Section 39.151) Shall Collect and Compile Information Related to Security of the Electric Grid. • Grid Security Advisory Committee Shall be Created and Study Texas Electric Grid and Computer Systems and Networks Related to the Grid and Prepare a Report No Later Than December 1, 2018. National Activities • NERC Approved the NERC GMDTF Proposal to Respond to the FERC’s Directives. • NERC GMD SDT WebEx on January 17 through 19, 2017. • FERC Deadline for Responses is May 29, 2018. Michael Juricek – 1/11/2017 PGDTF Meeting

  4. PGRRBen Richard’s 12/21/2016 E-mail PGDTF: Attached please find my first cut at the Draft PGRR for compliance with TPL-007-1 Requirement 1. This document will need to receive full ERCOT internal review before being submitted to ROS and perhaps before being submitted to PLWG for approval.  Accordingly, it is being offered to you for comments before having received full ERCOT internal review, as well as in parallel to ongoing ERCOT review, so please duly note this. I initially included dates and relative dates in this document but removed them after discussions with Mike J and while interpreting the “Guidelines for Creation/Modification of Planning Guides” to suggest that details would best be including in working group procedural documents instead of the Planning Guides (See “Guidelines for Creation/Modification of Planning Guides” http://www.ercot.com/committee/plwg ).  I subsequently submitted them without dates for a first cut review by Jeff.  Yet, Jeff’s first cut comments indicated that he felt we need the dates so I left his comments in the attached along with my responses as additional points for discussion. Michael Juricek – 1/11/2017 PGDTF Meeting

  5. PGRRContinued Also, below are some potential, best case scheduling, sponsoring scenarios for comparison.  The TSP/RE sponsor for posting appears to be least likely.  And, as I understand it, since PGDTF is a task force and not a working group, PGDTF would need ROS to direct it to sponsor this PGRR creating some scheduling concerns.  Yet, I still have scheduling concerns with ERCOT sponsoring this PGRR, receiving comments from PGDTF on 1/11/17, and submitting to RevisionRequest@ercot.com the next day (1/12/17), so we still need to sort through all of this and your comments would be appreciated.  The attached document is being offered to you for comments under the assumption that I will be the one to sponsor it as an ERCOT Planning Engineer. Michael Juricek – 1/11/2017 PGDTF Meeting

  6. PGRRContinued TSP/RE sponsored: 01/10/17 – PGRR posting deadline for 1/25/17 PLWG (TSP/RE would need to send draft to RevisionRequest@ercot.com asap – per Planning Guide 1.2.4.1, ERCOT would have 5 days to respond and 3 days to post after the draft is considered to be complete.) 01/11/17 – PGDTF reviews draft 01/25/17 – PLWG language review/approval 02/22/17 – PLWG IA review/approval 03/02/17 – ROS approval 03/23/17 – TAC approval 04/04/17 – Board approval Michael Juricek – 1/11/2017 PGDTF Meeting

  7. PGRRContinued PGDTF sponsored: 01/10/17 – PGRR posting deadline for 1/25/17 PLWG – PGDTF will miss this, if they want to wait for group review before filing. 01/11/17 – PGDTF reviews draft 02/02/17 – ROS grants permission for PGDTF to file PGRR 02/07/17 – PGRR posting deadline for 2/22/17 PLWG 02/22/17 – PLWG language review/approval 03/22/17 – PLWG IA review/approval 04/06/17 – ROS approval 04/27/17 – TAC approval 06/13/17 – Board approval Michael Juricek – 1/11/2017 PGDTF Meeting

  8. PGRRContinued ERCOT sponsored: 01/11/17 – PGDTF reviews draft 01/12/17 – ERCOT staff submits draft to RevisionRequest@ercot.com for assignment to Market Rules analyst. 01/16/17 – 12noon deadline for BP agenda/packet 01/18/17 – BP reviews draft, approves concept, sends to triage for IA 02/01/17 – BP reviews IA, approves posting 02/07/17 – PGRR/IA posting deadline 02/22/17 – PLWG language review/approval 03/22/17 – PLWG IA review/approval 04/06/17 – ROS approval 04/27/17 – TAC approval 06/13/17 – Board approval Michael Juricek – 1/11/2017 PGDTF Meeting

  9. Michael Juricek – 1/11/2017 PGDTF Meeting

  10. Schedule for Creating GIC System Model • 12/31/2016 – TSP Data for 345 kV System Based on 2021 Summer Peak Case Released on 10/15/2016 Due to ERCOT • 3/31/2017 – TSP Data for 138 kV and 69 kV Systems and RE Data Based on 2021 Summer Peak Case Released on 10/15/2016 and Update to 345 kV System Data Due to ERCOT • 6/1/2017 – ERCOT Provides First Pass of GIC System Model for Review to TSPs and REs • 7/1/2017 – TSPs and REs Provide Changes to GIC System Model to ERCOT • Subsequent Model Review Passes as Needed • 1/1/2018 – Complete 2021 Summer Peak and 2021 Minimum GIC System Models Using July 2017 SSWG 2021 Summer Peak and 2021 Minimum Base Cases Michael Juricek – 1/11/2017 PGDTF Meeting