An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Site RestorationRon Gilius

  2. Well Site Restoration Report Filed within 60 days after Site Restoration OG-00075

  3. Section A – Operator and Well Information Section B – Land Application of TopholeWater • Date of Application • Volume Discharged • pH and Specific Conductance

  4. Section C – Off-Site Waste Disposal • Residual Waste – Off-Site Disposal • Type of waste • Amount of Waste • Receiving Facility • Name • Permit # • Name and Address of Hauler

  5. Section D – On-Site Disposal – Drill Cuttings or Waste • Locate the Center in degrees and the distance from • the well head • Type of materials • Drill Cuttings above the casing seat • Drill Cuttings below the casing seat • Cement Returns • Drilling muds • Frac sands • Other

  6. Section E - Site Restoration • Earth Disturbance Activities Complete • - Site Restoration Complete • - Stormwater BMPS • - Permanent Stabilization

  7. Section F - Pit Disposal • Pit Dimensions • Procedures to Close Pit • Material and Thickness of subbase and Pit liner • Liner Manufacturer

  8. Section G – Land Application • Length and Width of Application Area • Ratio of Waste to Soil (not to exceed 1:1) • Chemical Analysis If Requested • (Oil and Gas Operator’s Manual)

  9. Joe Umholtz, Chief, Division of Resource Management & Well Development Department of Environmental Protection Rachel Carson State Office Building 400 Market Street | Harrisburg, PA 17101 Phone: 717.772.2199 | Fax: 717.772.2291 www.depweb.state.pa.us Skidding the Rig??