A Portfolio Model for the Allocation of Resources to Standardization Activities

A Portfolio Model for the Allocation of Resources to Standardization Activities. Antti Toppila, Ahti Salo and Juuso Liesiö Systems Analysis Laboratory Helsinki University of Technology P.O. Box 1100, 02015 TKK, Finland http://www.sal.tkk.fi firstname.lastname@tkk.fi.

Télécharger la présentation

A Portfolio Model for the Allocation of Resources to Standardization Activities

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. A Portfolio Model for the Allocation of Resources to Standardization Activities Antti Toppila, Ahti Salo and Juuso Liesiö Systems Analysis Laboratory Helsinki University of Technology P.O. Box 1100, 02015 TKK, Finland http://www.sal.tkk.fi firstname.lastname@tkk.fi

  2. Technical standardization • Agreement on a property of a good or service • E.g. railroad gauge, plug • Important part of R&D in the Telecommunication industry • Compatibility and interoperability • Access to a common pool of knowledge • Economies of scale • Our client was Nokia • Worlds largest mobile phone manufacturer (2007) • Spent more than EUR 5 billion into R&D

  3. Resourceallocation into standardization • Challenges in standardization portfolio management • Value from standardization are difficult to assess • Hundreds of linked standardization activities to manage • Investments need to be aligned with company core competences • Contribution to market growth should be explicitly considered • Value capturing through widely adopted technologies • Widely adopted technologies yield more sales • Widely adopted technologies need development • Standardization contributes to the emergence of widely adopted technologies • Widely adopted technologies may emerge without standards through intensive technology development

  4. Decision node Uncertainty node Value node Widely adopted technology successful? Widely adopted technology successful? Standardization successful? Standardization activity model Sales pd+(rD) yes ps (rs) no yes Commit rS rDresources to an activity No Sales 1-pd+ (rD) no yes rs= Standardization resources Sales 0 1- ps (rs) rd= Development resources pd- (rD) no ps= Standardization success probability pd+= Development success probability (assuming standardization success) 1-pd-(rD) pd-= Development success probability (assuming standardization failure) No Sales

  5. Standardization activity portfolio • Activities managed concurrently • Shared budget constraints • Interactions among activities • Portfolio model • Uncertainties of activities modeled with decision trees • Decisions variables: resource allocation to the activities • Maximize portfolio expected sales • Discretized problem solved with Zero-One Linear Programming A B C X

  6. Elicitation of parameters 1 • Current resource plan a point of departure • Estimates of success probabilities and prospective sales • Sales expressed as an interval, e.g. [50,100] M€ • Resource levels discretized • Standardization and (conditional) development success elicited for -100%, -50%, +0% and +100% changes to current level • Calculation of total success probability ptot = ps pd+ + (1 – ps ) pd- Prob. of success ps 0 rs +100% +0% -100% -50% 1 pd+ Prob. of success ptot pd- 0 rd +100% +0% -100% -50%

  7. Optimal resource allocation significantly different from the current Efficiency of the current allocation Maximum expected sales with current resources Expectedsales Minimum resource requirement for current expected sales Current resource allocation Budget

  8. Activity-specific decision recommendations • Interval sales imply multiple optimal resource allocations • Core Index for each activity-specific combined resource allocation is defined as the share of optimal portfolios with this allocation (cf. RPM; Liesiö et al. 2007) • Black: All optimal portfolios contain the allocation • Gray: Some optimal portfolios contain the allocation • White: No optimal portfolios with the allocation • Provides reallocation recommendations +100% rd +0% Activity A -50% -100% Development resources +0% +100% -100% -50% +100% +0% Activity B -50% -100% Standardization resources rs

  9. Activity interactions • Challenging to model • Numerous interactions identified • Some of these difficult to quantify • No statistical model for reference • Systematic elicitation and qualitative visualization of interaction networks useful • Overview of linked activities • Clustering of closely related activities • Used a heuristic to model pairwise interactions Competes Critical Critical Critical Competes Beneficial Beneficial Competes Critical Critical

  10. Critical C A Impact of heuristic interactions Without interaction • Penalties/rewards for decreasing/increasing attractiveness of linked activities • Proportional to size of benefit, etc. • Decision recommendations with and without interactions • Holistic view of the impact • Reveals the interactions that affect the decision • Not always the strongest interactions • Enables revision of interactions +100% +0% -50% -100% +0% +100% -100% -50% Development resources of A With interactions +100% +0% -50% -100% +0% +100% -100% -50% Standardization resources of A

  11. Conclusions • Complex decision making problem • Intangible conceptual structure • Need for transparent parameter elicitation and analysis • Portfolio model for allocation of resources • Benefits of standards concretized through widely adopted technologies • Robust decision recommendations for resource adjustments • Unified management framework for standardization activities • Equitable treatment of all activities • Common terminology to discuss resource allocation into standardization

  12. References • Cooper, R., Edgett, E. and Kleinschmidt, E. (1997). Portfolio Management for New Product Development: Lessons Learned from the Leaders-I, Research Technology Management, vol. 40, pp. 16-19. • Liesiö, J., Mild, P. and Salo, A. (2007) Preference Programming for Robust Portfolio Modeling and Project Selection. European Journal of Operational Research, vol. 181, pp. 1488-1505. • Salo, A. and Liesiö, J. (2006). A Case Study in Participatory Priority-Setting for a Scandinavian Research Program. International Journal of Information Technology & Decision Making, vol. 5, pp. 65-88. • Sharpe, P. and Keelin, T. (1998). How SmithKline Beecham Makes Better Resource-Allocation Decisions. Harvard Business Review, March-April, pp. 45-57. • Shurmer, M. and Lea, G. (1995). Telecommunications Standardization and Intellectual Property Rights: A Fundamental Dilemma? Standard-View, vol. 3, pp. 50-59.