MOBILE DISTRICT DREDGING PROGRAM

GULF REGIONAL DREDGING MEETING/WEDA. US Army Corps of Engineers Mobile District. MOBILE DISTRICT DREDGING PROGRAM. Panama City Beach. Type of Work: Beach Nourishment Length: 17 Mile Quantity: 500 Kcy Distance to Borrow Area: 20 Miles Type of Equipment: Hopper

colum
Télécharger la présentation

MOBILE DISTRICT DREDGING PROGRAM

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GULF REGIONAL DREDGING MEETING/WEDA US Army Corps of Engineers Mobile District MOBILE DISTRICT DREDGING PROGRAM

  2. Panama City Beach Type of Work: Beach Nourishment Length: 17 Mile Quantity: 500 Kcy Distance to Borrow Area: 20 Miles Type of Equipment: Hopper Small Business Set Aside: No Schedule: Mid FY08 Panama City Beach

  3. Mobile Harbor Extension 2100/1200 Type of Work: New Work Depth: 45’ Width: 500’ Length: 3300’ Quantity: 300 Kcy Type of Material: Sand/Clay Placement Area: Ocean D/A Distance to Placement Area: 40 Miles Type of Equipment: Bucket/Hopper Set Aside: No Schedule: Bid Opening 17 January 2008 Mobile Harbor Extension

  4. Gulfport Harbor Widening Type of Work: New Work Depth: 36’ Width: Widen from 220 to 300’ Length: 20+ Miles Quantity: 5.4 Mcy Type of Material: Hard Sand and Clay Placement Area: New Ocean D/A Distance to Placement Area: 30 Miles Type of Equipment: Bucket/Hopper Small Business Set Aside: No Last Dredged: 2007 Schedule: Bid Opening April 2008

  5. Pascagoula Harbor Deepening Type of Work: New Work Depth: Deepen Upper Sound from 38’ to 42’ Width: Bar Channel widen from 350 to 550’ Length: 11 Miles Quantity: 8 Mcy Type of Material: Sands and Clay Placement Area: Ocean D/A Distance to Placement Area: 20 miles Type of Equipment: Bucket/hopper Small Business Set Aside: No Schedule: Bid Opening – June 2008

  6. Figure 1. Project Location Hancock County Streams – Hancock County Marina

  7. Hancock County Streams Cowan Bayou

  8. Gautier Streams – 5 channels

  9. Bayou Caddy Marsh Restoration Project Bayou Caddy New Marsh Containment Structure Figure 3. Rendering of proposed plan for Bayou Caddy by Ron Dawkins Bayou Caddy Containment

  10. Pascagoula

  11. Panama CityBeach Carillon/Pinnacle Port Type of Work: Beach Nourishment Length: 1 Mile Quantity: 300 Kcy Distance to Borrow Area: 20 Miles Type of Equipment: Hopper Small Business Set Aside: No Schedule: Mid FY09 Carillon/Pinnacle Port

  12. Pensacola Navy Channel Type of Work: Maintenance Depth: 44’ Width: 500’ - 800’ Length: 5 Miles Quantity: 4.5 - 8.0 Mcy Type of Material: Silts and Sands Placement Area: Ocean D/A, Beach and Littoral Zone Distance to Placement Area: Varies Type of Equipment: Hopper/Pipeline Small Business Set Aside: No Last Dredged: 1990 Schedule: January 2009

  13. Mobile Harbor Turning Basin Type of Work: New Work Depth: 45’ Quantity: 2.2 Mcy Type of Material: Sand, Silt and Clay Placement Area:Upland/Gaillard Distance to Placement Area: 13 Miles Type of Equipment: Bucket /Pipeline Small Business Set Aside: No Schedule: mid – FY09 Mobile Harbor Extension

  14. Dune Lakes Walton County, Florida Walton County, Florida - Beaches Type of Work: Beach Renourishment Quantity: 2 Mcy Length: 26 Miles Type of Equipment: Hopper/Pipeline Small Business Set Aside: No Schedule: Late FY 09 Walton County Gulf of Mexico Post-Ivan 2004 May 2003