1 / 14

VA/DoD Joint Venture Conference - New Mexico VA Healthcare System Renovations and Future Initiatives

This presentation discusses the renovations and future initiatives at the New Mexico VA Healthcare System, including a solar covered parking project. It also highlights the performance measures and access to care at the 377th Medical Group.

content
Télécharger la présentation

VA/DoD Joint Venture Conference - New Mexico VA Healthcare System Renovations and Future Initiatives

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 2010 VA/DoD Joint Venture Conference New Mexico VA Health Care System 377th Medical Group, Kirtland AFB Albuquerque, NM 377 Medical Group Commander: Col Steven Reese 377 Medical Group Joint Venture Director: Ms. Patricia Ospino NMVAHCS Associate Director: Ms. Kaye Green NMVAHCS Joint Venture Director: Ms. Donna Saffioti

  2. New Initiatives – Projects Closed

  3. NMVAHCS DECON AREA BEFORE AND AFTER SPACE RENOVATION BEFORE RENOVATION: NON-AMBULATORY DECON SHOWER AREA AFTER RENOVATION: NON-AMBULATORY DECON SHOWER AREA

  4. POST RENOVATION: POST-DECONTAMINATION CLEAN AREA POST RENOVATION: TEAM DRESSING AREA

  5. Joint Venture Performance Measures Slides 7 - 10 represent Performance Measures for items 1 & 2

  6. 377 MDG expenditures paid to VA

  7. 377 MDG encounters at the NMVAHCS Data includes Inpatient admissions, Outpatient visits, Lab tests, Imaging studies, Ed Visits not resulting in Admission and ASU procedures.

  8. FY 2010 MEDICAL GROUP CLINICAL ENCOUNTERS AT THE NMVAHCS

  9. FY2010 MDG Laboratory and Imaging studies performed at the VA

  10. Access to Military Installation Procedures

  11. Access to Care and Referral Management

  12. Future Initiatives and/or Proposals

  13. Additional Information • Solar Covered Parking Project: • Project dates: • Awarded in May 2010 • “Notice to Proceed” given July 2010 • Expected completion is March 2011 • Total cost: VA & MDG • Total cost is $19,040,424. MDG parking lot portion of that is $4,987,769. • Energy supplied back to VA • Projected is expected to generate over 4.9 million kilowatt hours, which is over 20% of VA’s annual electricity usage

  14. Solar Covered Parking Project

More Related