An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Award Criteria Public Sector Electrical and/or Thermal Energy Efficiency Project

  2. The Dublin Institute Of Technology • Largest 3rd Level Educational Institute in the country. • Founded in 1992 from the six CDVEC’s but dates back to 1887. • 44 separate buildings located between the two canals in Dublin City centre.

  3. Dublin Institute Of Technology Cathal Brugha Street • Built 1941. Landmark Art Deco Building • School of Domestic Science • Faculty of Tourism & Food • 8 full size training kitchens • 2 Restaurant kitchens with Dining Rooms • 1 Staff and Student Cafeteria Restaurant

  4. ProjectBrief • To Improve the relatively poor energy • performance for the building • 302 KWh/m2 • The project was co-funded by: Sustainable Energy Ireland and The department of Education and Science

  5. Plant History • 1950 Two “Ideal Britannia” Solid Fuel open chamber boilers fitted. 1,982,000 Btu (580 Kw) each.. Heating • 1955 One “Ideal Britannia” Solid Fuel open chamber boilers fitted. 1,132,000 Btu (330 Kw). DHW • 1955 One 200 Gallon storage calorifer fitted • 1960 - 70’s Three more 200 Gallon storage calorifer fitted as demand increased and new teaching kitchens added. • 1980’s Three boilers converted to natural gas. • Controls. One “Sangamo” time clock operated in the manual position. (Switched on and off by the Porter)

  6. The Project • Phase One • Boiler Replacement. • Phase Two • Domestic Hot Water System Replacement. • Phase Three • Installation of a control system. (BMS)

  7. 3 Boilers were open chambered solid fuel. Retro fitted with Natural gas burners. No lead / lag. No separate boiler isolation. No controls. No insulation. Phase 1

  8. Fit 2 new Buderus “Thermostream” 300 kw boilers. Install a new valve and pipeing arrangement to allow for combined / separate heating and DHW. Phase 1

  9. 4 x 200 gallon DHW storage calorifiers fitted over a period of time as demand increased. No controls. Inefficient. Water storage not meeting demand Phase 2

  10. Install 2 x “ACV” “tank-in-tank” hot water storage tanks. Re-pipe the flow and return headers. Phase 2

  11. Phase 3 • Installation of a “Trend” Building Management System. • More accurate control of both Heating and DHW systems. • A reduction in energy consumption and environmental impact of energy use. • Live metering of utility consumption: Gas, Electricity and Water • Control strategies. • Winter Summer Mode • Degree Day Mode. • Optimisation.

  12. Conclusions • Energy Performance improved from 302 kWh/m2 to212 kWh/m2 • Energy Savings in first year 30 % Second year projected a further 10 % • Investment payback 3 years. • Addressed DHW peak demand issues.

  13. Questions ? Paul Mc Dunphy Dublin Institute Of Technology Cathal Brugha Street 01 402 4523 087 2250015 Paul.mcdunphy@dit.ie