1 / 3
K12 TECHNICAL RUN
30 likes | 139 Vues
Lau Gatignon, EATM 11 December 2012. K12 TECHNICAL RUN. K12 OPERATION. Last profiles at end of run (highest intensities). After final tuning. E.g. profile at Big Fiscs :. 30±0.1 mm 20±0.1 mm. 30 mm (X) 20 mm (Y). CEDAR, L ~ 6 m.
Télécharger la présentation
K12 TECHNICAL RUN
An Image/Link below is provided (as is) to download presentation
Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.
Content is provided to you AS IS for your information and personal use only.
Download presentation by click this link.
While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.
During download, if you can't get a presentation, the file might be deleted by the publisher.
E N D
Presentation Transcript
Lau Gatignon, EATM 11 December 2012 K12 TECHNICAL RUN
K12 OPERATION Last profiles at end of run (highest intensities)
After final tuning E.g. profile at Big Fiscs: 30±0.1 mm 20±0.1 mm 30 mm (X) 20 mm (Y) CEDAR, L ~ 6 m K12 status and LS1 plans
More Related