An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. VIII. SUMBERDAYA MANUSIA DALAM MANAJEMEN OPERASI A. PERKEMBANGAN MANAJEMEN SUMBERDAYA MANUSIA • MANAJEMEN ILMIAH • PENDEKATAN PERILAKU • Perluasan pekerjaan secara horizontal • Perluasan pekerjaan secara vertikal • Rotasi Pekerjaan

  2. KECENDERUNGAN KONTEMPORER • Fleksibilitas pekerjaan • Pertanggungjawaban dan pemberdayaan • Peningkatan keahlian dan kemampuan • Pelibatan pekerja • Kompensasi pekerja • Teknologi dan otomatisasi • Pekerja-pekerja temporer • Kepuasan kerja

  3. B. ELEMEN-ELEMEN DISAIN PEKERJAAN • ANALISIS TUGAS (TASK ANALYSIS) • ANALISIS PEKERJA (WORKER ANALYSIS) • ANALISIS LINGKUNGAN PEKERJAAN C. ANALISIS PEKERJAAN • PROCESS FLOWCHART • WORKER-MACHINE CHART

  4. ANALISIS TUGAS (TASK ANALYSIS) • Description of task to be performed • Task sequence • Function of tasks • Frequency of tasks • Criticality of tasks • Relationship with order jobs/tasks • Performance requirement • Information requirement • Control requirement • Error possibilities • Task durations • Equipment requirement

  5. ANALISIS PEKERJA (WORKER ANALYSIS) • capability requirement • Performance requirement • Evaluation • Skill level • Job training • Physical requirement • Mental stress • Boredom • Motivation • Number of workers • Level of responsibility • Monitoring level • Quality responsibility • Empowerment level

  6. ANALISIS LINGKUNGAN PEKERJAAN ( Environmental Analysis ) • Workplace location • Process location • Temperature humidity • Lighting • Ventilation • safety • Logistics • Space requirement • Noise • Vibration

  7. PROCESS FLOWCHART Simbol-simbol Flow-Chart

  8. Contoh : Process Flowchart

  9. Contoh : Process Flowchart

  10. Contoh : Process Flowchart

  11. WORKER-MACHINE CHART

  12. D. PENGUKURAN PEKERJAAN • STOPWACH TIME STUDI • NUMBER OF CYCLE • ELEMENTAL TIME FILES • PREDETERMINED MOTION TIME • WORK SAMPLING • LEARNING CURVE

  13. ELEMENTAL TIME FILES Elemental standard time files are predetermine job element time • PREDETERMINED MOTION TIME Predetermined Motion Time are predetermined times for basic micromotions

  14. STOPWACH TIME STUDY Langkah-langkah Stopwatch Time Study • Establish the standard job method • Break down the job into element • Study the job • Rate the workers performance • Compute the average time • Compute the normal time • Normal time = (elemental average time)(Rating Factor) • Nt = (t)(RF) • Normal Cycle Time = Summing the elemental mormal times • Compute the standard time • Standard time = (Normal Cycle Time)(1+Allowance Factor) • ST = (NT) (1+AF)

  15. NUMBER OF CYCLE

  16. WORK SAMPLING Langkah-langkah Work Sampling • Define the job activities • Determine the number of observations in the work sample • Determine the length of sampling period • Conduct the work sampling study and record the observations • Periodically recompute the number of observations

  17. LEARNING CURVE Processing time per unit Unit produced