Implementation Plan for Urban Waste Water Treatment Directive in Albania

This project aims to implement the National Plan for Approximation of Environmental Legislation in Albania, funded by the European Union. The plan includes a legal gap analysis, stakeholder discussions, and identification of implementation measures and costs. The final goal is to establish sewerage systems and wastewater treatment plants for urban agglomerations larger than 2000 person equivalents.

Télécharger la présentation

Implementation Plan for Urban Waste Water Treatment Directive in Albania

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Implementation plan for Urban Waste Water Treatment Directive in AlbaniaProf. As. Dr. MSc. Narin PANARITIINPAEL CARDS Project Implementation of the National Plan for Approximation of Environmental Legislation A project for Albania funded by the European Union

  2. Method and purpose Methods used for this study comprise: • documents and legal framework overview, • legal gap analysis, • discussion with main stakeholders, • Identification of necessary implementation measures and • their cost assessment. Final purpose: Realisation of sewerage systems and wastewater treatment plants for the urban agglomerations larger than 2000 person equivalents

  3. Implementation of the National Plan for Approximation of Environmental Legislation A project for Albania funded by the European Union Plan development Implementation plan was developed in 3 steps: • Inventory of status of existing water supply, sewerage and wastewater treatment in Albanian cities • Identification of urban agglomerations • Preliminary design of sewerage and wastewater treatment systems for the agglomerations

  4. Implementation of the National Plan for Approximation of Environmental Legislation A project for Albania funded by the European Union Existing situation Population of Albania: 3,200,000 Population served by public water supply: 2,500,000 Population connected to sewerage system: 1,500,000

  5. Implementation of the National Plan for Approximation of Environmental Legislation A project for Albania funded by the European Union Wastewater treatment status • Kavaje WWTP in operation • Vlore WWTP construction completed, not yet in operation • Pogradec WWTP in operation • Durres WWTP under construction • Lezhe WWTP under construction • Sarande WWTP under construction • Korce WWTP under construction • Shkoder WWTP planned • Shiroke WWTP planned (in Shkoder Municipality) • Velipoje WWTP planned • Tirana WWTP planned

  6. Implementation of the National Plan for Approximation of Environmental Legislation A project for Albania funded by the European Union Selection of agglomerations Preliminary selection of agglomerations through: Territory of Albania divided into 6 river basin districts Selection of all settlements > 1000 inhabitants (Census 2001 report) Clustering of settlements into agglomerations where centralised wastewater treatment may seem feasible on the basis of geographical information

  7. Implementation of the National Plan for Approximation of Environmental Legislation A project for Albania funded by the European Union Agglomerations

  8. Implementation of the National Plan for Approximation of Environmental Legislation A project for Albania funded by the European Union Agglomerations sizes

  9. Implementation of the National Plan for Approximation of Environmental Legislation A project for Albania funded by the European Union Preliminary design/cost estimates Preliminary design and costs estimates for sewerage systems and wastewater treatment plants for the agglomerations Sewerage system: Estimate of numbers of persons to be connected Cost estimate on the basis of unit costs per person

  10. Implementation of the National Plan for Approximation of Environmental Legislation A project for Albania funded by the European Union Wastewater treatment Conventional activated sludge treatment for agglomerations < 10000 PE Advanced activated sludge treatment for agglomerations > 10000 PE (possibly alternative solutions for small agglomerations)

  11. Implementation of the National Plan for Approximation of Environmental Legislation A project for Albania funded by the European Union Conventional treatment Conventional WWTP consists of following basic steps: • Screening • Grit removal • Primary sedimentation • Aeration • Secondary sedimentation • Effluent discharge • Sludge thickening • Anaerobic sludge digestion • Sludge dewatering • Sludge disposal

  12. Implementation of the National Plan for Approximation of Environmental Legislation A project for Albania funded by the European Union Advanced treatment Advanced WWTP consists of the following basic steps: • Screening • Grit removal • Anaerobic tank • Aeration • Secondary sedimentation • Effluent discharge • Sludge thickening • Sludge dewatering • Sludge disposal

  13. Implementation of the National Plan for Approximation of Environmental Legislation A project for Albania funded by the European Union Plan implementation Master plan implementation – Sequence of actions for each agglomeration • Feasibility study (and EIA) to select optimum solution for wastewater management • Institutional and organisational arrangements to achieve compliance • Preparation of detailed plan for construction works • Tender procedures, construction, commissioning

  14. The costs 14 TOTAL COSTS

  15. The costs 15

  16. The benefits 16

  17. Thank you for your attention!!!