An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Yamaha AssessmentPlant #2 – Assembly Line September 15 – 23, 2005

  2. The value to our client: • Knowledge Transfer • Change agent to infuse a lean culture to achieve GREAT results!

  3. Goals • Quickly identify opportunities to reduce non-value added activities on the assembly line. • Validate assembly line issues through qualitative and quantitative information. • Develop current state and future state maps. • Create an approach to improve line balance.

  4. Time Studies (Quick) • Measure of cycle times that captured all activities (NVA and VA). • Detailed Rhino Observations • Sampling of Golf Cart • Did not include waiting time

  5. Line Balance ObservationsTakt vs. Pitch Takt Time in November = 1.43 Pitch = 1.35 Takt Time in March = 1.33

  6. Line Balance ObservationsTakt vs. Pitch Takt Time in November = 1.43 Pitch = 1.35 Takt Time in March = 1.33

  7. Line Balance ObservationsTakt vs. Pitch Takt Time in November = 1.43 Pitch = 1.35 Takt Time in March = 1.33

  8. Line Balance ObservationsTakt vs. Pitch Takt Time in November = 1.43 Pitch = 1.35 Takt Time in March = 1.33

  9. Line Balance ObservationsTakt vs. Pitch Takt Time in November = 1.43 Pitch = 1.35 Takt Time in March = 1.33

  10. Line Balance ObservationsTakt vs. Pitch Takt Time in November = 1.43 Pitch = 1.35 Takt Time in March = 1.33

  11. Current State – Plant #2 Assembly

  12. Short Term Future State – Plant #2 Assembly

  13. Concept: • Weld, Paint, Assy to operate on two shift operation • Level Load (1-5unit) run sizes to minimize WIP & to maintain ‘std’ employee level for assy. line

  14. Next Steps • Line Balancing Kaizen Events • Total 11 projects (sections within zones) • 3 - 5 day events with a cross functional team dedicated for the week to improve a specific area. • Projects would include: • Detail time studies of NVA & VA activities per operator • Waste Reduction • 5S • Quality Improvements • New line balance work content for Rhino • Standard operating procedures

  15. Line Balance Kaizen Team • 2-3 Operators • Supervisor • ME • Quality • Material Handler • Support Staff

  16. Project Week

  17. Recommendations • Create a Business Unit organizational structure for plant #2. • Develop a Lean Strategy for Plant #2 • Select a Lean Champion to help lead and sustain improvements. • Kaizen events that involve employees to improve work area, reduce WASTE and sustain improvements. • Ergonomic Study

  18. Thank You to Plant #2!