1 / 28

ANALISIS DAN PERANCANGAN PENUKAR KALOR UNTUK MENINGKATKAN KINERJA PLTU

ANALISIS DAN PERANCANGAN PENUKAR KALOR UNTUK MENINGKATKAN KINERJA PLTU. KURSUS SINGKAT PT PLN ( Persero ) LITBANG NOVEMBER 2013. Day 1. Heat Balance Diagram PLTU. Latar Belakang. Heat balance diagram menunjukkan keseimbagan massa dan energi pada setiap komponen siklus uap PLTU.

darrin
Télécharger la présentation

ANALISIS DAN PERANCANGAN PENUKAR KALOR UNTUK MENINGKATKAN KINERJA PLTU

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ANALISIS DAN PERANCANGAN PENUKAR KALOR UNTUK MENINGKATKAN KINERJA PLTU KURSUS SINGKAT PT PLN (Persero) LITBANG NOVEMBER 2013

  2. Day 1 Heat Balance Diagram PLTU

  3. LatarBelakang • Heat balance diagram menunjukkankeseimbaganmassadanenergipadasetiapkomponensiklusuap PLTU. • Heat balance diagram merupakandasarperancangansuatu PLTU dandijadikanacuankinerjapadasaat commissioning. • Heat balance diagram sangatpentingbagimanajemendan operator PLTU dalamupayamencapaikinerja PLTU yang maksimal.

  4. SiklusDasar PLTU • Siklusdasar PLTU umumnyamenggunakansiklus Rankine sederhana. • Efisiensisertakehandalansiklus PLTU initerlalurendah. • Hanyaditerapkanpada PLTU kapasitaskecil (< 2 MW). • Untuk PLTU kapasitasbesar, umumnyadigunakansiklus Rankine superheating, reheating, dan/atauregeneratif.

  5. Siklus Rankine sederhana

  6. Siklus Rankine sederhana

  7. Siklus Rankine dengan Superheating

  8. Siklus Rankine denganSuperheating & Reheating

  9. Siklus Rankine denganRegenerating

  10. Siklus Rankine PLTU KapasitasBesar Reheater Condenser Open Feedwater Heater (Deaerator, DEA) Closed Feedwater Heater (HP Heater) Closed Feedwater Heater (LP Heater)

  11. Heat Exchanger pada PLTU • Condenser  tipeshell and tube • Deaerator  tipedirect contact • HP & LP Heater  tipeshell and tube • Oil cooler  tipeshell and tube • Terkadang oil cooler atau condenser menggunakantipeair-cooled

  12. Shell and Tube Air-cooled

  13. Deaerator

  14. StudiKasus PLTU Unit 3 TambakLorok Semarang

  15. Siklus PLTU Unit 3 TambakLorok • Kapasitas: 200 MW gross. • Menggunakan superheating dan reheating. • Memilikisatudeaerator. • Memiliki 3 Low Pressure Heater (LP Heater). • Memiliki 2 High Pressure Heater (HP Heater). • Mulaiberoperasipadatahun 1980. • Awalnyadioperasikandenganbahanbakarminyak(MFO). • Saatinitidakdioperasikankarenamenunggupasokan gas.

  16. Base Case

  17. Case 1 - Base 41,321%

  18. Case 2 – Base 41,321%

  19. Case 3 - Base 41,321%

  20. Case 4 – Base 41,321%

  21. Case 5 – Base 41,321%

  22. KenaikanBiayaOperasional • Untuk Base Case dan Case 1, beban 200 MW gross. • Heat rate base case: 2.081 kCal/kWh. • Heat rate Case 1: 2.105 kCal/kWh. • Jika HHV batubara 5.500 kCal/kg makapenambahankonsumsibatubarasebesar 850 kg/jam, atau 20.403 kg/hari. • Jikahargabatubara 65 USD per ton dankurs 1 USD = Rp 11.000 , makakenaikanbiayasebesarRp 14.588.320 per hari, atausekitarRp 5 milyar per tahununtuk 8.000 jam operasi PLTU dalamsatutahun.

  23. Latihan 1 • Copy file heat balance PLTU TambakLorok Unit 3. • Ubahtekanankondensordari 0,097 baramenjadi 0,08 bara. • Perhatikanperubahanefisiensi yang terjadi. • Diskusikanhasilnya.

  24. Latihan 2 • Simulasikankondisioperasidengan HP Heater #2 rusak. • Caranya: ubahkenaikantemperaturfeedwatermenjadi 0 (nol). • Jalankan Cycle-Tempo untukmemperolehkeseimbangan yang baru. • Perhatikankeseimbanganmassadanenergi di tiapkomponen. • Diskusikanpengaruhnyaterhadapkinerja PLTU tersebut.

  25. Latihan 3 • Lakukanhal yang samasepertipadaLatihan 2 untukkeempat heater lainnya. • Buatkenaikantemperaturfeedwaterpada HP Heater #1 samadengan 0 (nol). • Demikian pula untukkasus lain, buattemperatur condensate pada LP Heater #1, #2, atau #3 samadengannol (0). • Diskusikankeseimbanganbaru yang diperoleh.

  26. Tugas • Cariheat balance diagram dankondisioperasiaktualsalahsatuPLTU di lingkungan PLN. • Bandingkankondisiaktualdengankondisikeseimbanganmenurut heat balance diagram. • Tentukankinerjaaktual PLTU Unit 3 tersebut. • Diskusikanjikakinerjaaktualberbedadengankinerjamenurut heat balance diagram.

  27. TerimaKasih