An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PREX/Happex Collaboration Meeting May 17th 2007 Alexandre Camsonne Compton polarimeterElectron detector upgrade andstatus Happex Collaboration Meeting

  2. Happex Collaboration Meeting Electron detector • 4 planes microstrip 128 strips • Located about 5 mm from electron beam • Detection of Compton electrons using 3rd dipole of the chicane as analyzer

  3. Happex Collaboration Meeting Upgrade • Mechanical • New vertical motion system and accomodation of the new electronics • Electronics • Switch to 192 microstrips for improved resolution to reduce systematics • DAQ • Analysis

  4. Happex Collaboration Meeting Mechanical design • Design Clermont-Ferrand • Complete • Most parts in procurement • http://clrwww.in2p3.fr/meca/plans/Site-web/Cebaf/TJN-DetE/TJN-DetE-P2.html • Control motion • Motor ordered • Controls/interlocks to be developed

  5. Happex Collaboration Meeting Mechanical design • Integration JLab • CAD drawings from Clermont Ferrand to check for interference • Support stand design complete

  6. Happex Collaboration Meeting Electronics • Detectors strips at Clermont Ferrand • 4 planes 192 strips • Amplifier • Design complete • Being manufactured • Complete testing to be done • Trigger • Work on board routing in process • Design done 1 or 2 months • Test card trigger done for test in July

  7. Happex Collaboration Meeting DAQ • Trigger and readout similar to previous detector • Crl to be adapted • Synchronization/integration with photon detector ( coincidence trigger) Work will start by spring 2008 when everything at JLab ( 2 months )

  8. Happex Collaboration Meeting Analysis • Reuse of Etienne Burtin, Stephanie Escoffie software • Addition of David Lhuillier improvements • Scaling of old software or rewriting of software ?

  9. Happex Collaboration Meeting Man power • Clermont • Bernard Michel ( Electronics ) • Michel Brossard ( Physicist ) • Guy Savinel (?) ( Mechanical) • Jefferson Laboratory • Sue Witherspoon (EPICS Slow control) • Alexandre Camsonne ( DAQ / Analysis) • More people ?

  10. Happex Collaboration Meeting Conclusion • Mechanical design complete • Progress on the electron detector electronics • Final date for installation to be determined • All components ready by end of 2007 ready for installation beginning 2008