Gamma-ray Large Area Space Telescope. GLAST Large Area Telescope Calorimeter Subsystem. 2.0 Management W. Neil Johnson Naval Research Lab, Washington DC Calorimeter Subsystem Manager neil.johnson@nrl.navy.mil (202)–767–6817. Outline. Organization Work Flow / Fabrication Plan

davina
Télécharger la présentation

GLAST Large Area Telescope Calorimeter Subsystem

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Gamma-ray Large Area Space Telescope GLAST Large Area Telescope Calorimeter Subsystem 2.0 Management W. Neil Johnson Naval Research Lab, Washington DC Calorimeter Subsystem Manager neil.johnson@nrl.navy.mil (202)–767–6817

  2. Outline • Organization • Work Flow / Fabrication Plan • Schedule Summary • Critical Path Analysis • Procurements

  3. Calorimeter – Institutional Organization

  4. CAL Subsystem WBS

  5. Calorimeter Work Flow Dual PIN Diodes(DPD) NRL/CEA CsI CrystalsSweden (KTH) Front-End Electronics NRL, SLAC Mechanical StructureFrance (IN2P3/Ecole Polytechnique) Crystal Detector Element (CDE) AssemblyFrance (CEA/DAPNIA) Optical Wrap Bond PIN Diode (each end) 18 CsI Crystal 18 Module Assemblyand Test, NRL+collab End Cap Wireleads 1728 PreElectronics Module (PEM) AssemblyNRL 18 16 Flight modules + 1 Qual + 1 Spare

  6. CAL Hardware Collaborators

  7. CAL Summary Schedule Module Available Dates (RFI) Module Need Dates (RFI)

  8. CAL Qual Module (FMA) Dual PIN Photodiode NRL, CEA/Salcay 06/18/03 (29) Crystal Detector Elements (CDE)CEA/Saclay 08/29/03 (1) Pre Electronics ModuleNRL10/08/03 (1) CsI CrystalsSweden 03/21/03 (88) CAL ModuleNRL11/17/03 (1) Carbon Composite StructureAl base, closeouts, plastic partsLLR/Ecole Polytechnique 07/24/03 (30) Analog Front End Electronics (AFEE) NRL 10/09/03 (1) ASICsSLAC, NRL07/30/03 (1) Other EEE partsParts Qual/Screen NRL08/08/03 (1) CalibrationEnvironmental TestNRL01/26/04 (0) Ready for Integration (RFI)02/17/04 (0)(L3: 02/17/04) PCBNRL, SLAC06/23/03 (34) Completion Dates (float)

  9. CAL Flight Module 3 Dual PIN Photodiode NRL, France 08/04/03 (81) Crystal Detector Elements (CDE)CEA/Saclay 10/27/03 (68) Pre Electronics ModuleNRL11/17/03 (68) CsI CrystalsSweden 05/16/03 (132) CAL ModuleNRL01/15/04 (62) Carbon Composite Structure Al base, closeouts, plastic partsLLR/Ecole Poly 09/15/03 (101) Analog Front End Electronics (AFEE) NRL 10/24/03 (85) ASICsSLAC, NRL 07/30/03 Other EEE partsParts Qual/Screen NRL 08/08/03 CalibrationEnvironmental TestNRL03/04/04 (54) Ready for Integration (RFI)03/30/04 (54)(L3: 06/15/04) PCB NRL, SLAC 06/23/03 Completion Dates (float)

  10. CAL Flight Module 16 Dual PIN Photodiode NRL, France 12/18/03 (104) Crystal Detector Elements (CDE)CEA/Saclay 04/23/04 (45) Pre Electronics ModuleNRL05/15/04 (45) CsI CrystalsSweden 11/19/03 (120) CAL ModuleNRL06/02/04 (44) Carbon Composite Structure Al base, closeouts, plastic partsLLR/Ecole Poly 03/24/04 (70) Analog Front End Electronics (AFEE) NRL 01/14/04 (177) ASICsSLAC, NRL 07/30/03 Other EEE partsParts Qual/Screen NRL 08/08/03 CalibrationEnvironmental TestNRL06/25/04 (45) Ready for Integration (RFI)07/22/04 (45)(L3: 09/24/04) PCB NRL, SLAC 06/23/03 Completion Dates (float)

  11. CAL Procurements

  12. CAL Procurements (2)